WELL · 42-287-30493 · DISTRICT 3

Minerva #1H

N

Lee County · Giddings (Austin Chalk-3) field  · Horizontal · Sidetrack

Minerva #1H (API 42-287-30493) is a horizontal well in Lee County operated by Magnolia Oil & Gas Operating LLC, completed August 3, 1979.

The RRC has issued 2 drilling permits between 1979 and 1994, permitted to 8,500 ft.

It was permitted by Columbia Gas Development Corp. and has since transferred to Magnolia Oil & Gas Operating LLC on the wellbore schedule.

Completion filings report one formation top, including Austin Chalk.

Its lease has reported 109K barrels of oil and 101K mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Magnolia Oil & Gas Operating LLC

Permitted by Columbia Gas Development Corp.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 4, 2026 · 615 permits on file · (713) 345-6206

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMagnolia Oil & Gas Operating LLC
Production reportsMagnolia Oil & Gas Operating LLCthrough Jan 2026
Latest permitColumbia Gas Development Corp.Oct 5, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,500
total depth, ft
2
permits on file
Oct 5, 1994
last permit issued
Aug 3, 1979
completed
109K
cumulative oil, bbl
101K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 3, 1979
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Minerva O-3-12395Giddings (Austin Chalk-3)Magnolia Oil & Gas Operating LLC2109K101KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 549 · prior 12 1,182(-54%)

0100200202420252026

Gas, mcf lease total

Last 12 months 89 · prior 12 230(-61%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Browning Oil Company, Inc.Jan 1993 → Mar 2019
  2. 2Dallas Petroleum Group, LLCApr 2019 → Jul 2025
  3. 3Magnolia Oil & Gas Operating LLCAug 2025 → Jan 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
428648-99Recompletion · sidetrackColumbia Gas Development Corp.Sep 29, 1994Oct 5, 1994Dec 22, 19947,800
48015-99DrillHumble Exploration Co., Inc.May 7, 1979May 7, 1979—8,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-12395————
—— O-3-12395————

Formation tops

As filed on W-2/G-1. Subsea from 274 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk7,170-6,896

Perforations

Perforated and open-hole intervals.

FromToType
7,1937,784Perforated
7,1939,930Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,71512.251,270 S
2.3757,050——
5.58,1608.75620 S
5.58,1618.75620 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 15, 1995Feb 10, 1995Yes
00Mar 8, 1995Aug 9, 1979—
00Jan 12, 1984Aug 9, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28730493, documented in the API reference.