WELL · 42-287-30573 · DISTRICT 3

Two Fingers A #2

N

Lee County · Giddings (Austin Chalk Gas) field  · Horizontal · Sidetrack

Two Fingers A #2 (API 42-287-30573) is a horizontal well in Lee County operated by Coffman Thomas D., completed October 13, 1979.

The RRC has issued 2 drilling permits (amended once) between 1979 and 1995, permitted to 9,500 ft.

It was permitted by Gemini Exploration Company and has since transferred to Coffman Thomas D. on the wellbore schedule.

Completion filings report 3 formation tops, including Wilcox, Navarro, Pecan Gap.

No lease production has been reported under this well’s leases.

Operator of record

Coffman Thomas D.

Permitted by Gemini Exploration Company; the EWA schedule now lists a different operator.

Austin, TX · P-5 Y, filed Jan 15, 1982 · 46 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCoffman Thomas D.
Production reportsMagnolia Oil & Gas Operating LLCthrough Apr 2026
Latest permitArrow Exploration CompanyJan 19, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,500
total depth, ft
3
permits on file
Jan 19, 1995
last permit issued
Oct 13, 1979
completed
0
cumulative oil, bbl
2.98M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 13, 1979
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Two Fingers "A" G-3-107539Giddings (Austin Chalk, Gas)Magnolia Oil & Gas Operating LLC102.98MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 17,290 · prior 12 18,313(-6%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1United Oil & Minerals, Inc.Jan 1993 → Jun 1994
  2. 2Arrow Exploration CompanyJul 1994 → Jan 1995
  3. 3Gemini Exploration CompanyFeb 1995 → Apr 1995
  4. 4Union Pacific Austin Chalk Co.May 1995 → Jan 2001
  5. 5Rme Austin Chalk CompanyFeb 2001 → Nov 2002
  6. 6Anadarko Austin Chalk CompanyDec 2002 → Feb 2006
  7. 7Anadarko E&P Company LPMar 2006 → Jul 2007
  8. 8Enervest Operating, L.L.C.Aug 2007 → Jul 2018
  9. 9Magnolia Oil & Gas Operating LLCAug 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
432043-98Recompletion · sidetrackGemini Exploration CompanyFeb 7, 1995Jan 19, 1995Feb 4, 19959,200
432043-99Recompletion · sidetrackArrow Exploration CompanyJan 19, 1995Jan 19, 1995—9,500
60926-99DrillCoffman, Thomas D. Inc.Oct 17, 1979Oct 17, 1979—9,303

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-107539————

Formation tops

As filed on W-2/G-1. Subsea from 263 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox5,475-5,212
Navarro6,538-6,275
Pecan Gap7,930-7,667

Perforations

Perforated and open-hole intervals.

FromToType
8,1878,918Perforated
8,6508,748Perforated
8,79910,767Perforated
8,9189,187Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
164020100 S
8.6253,50812.2515 S
2.3758,400——
5.59,3007.87515 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 4, 1995Mar 16, 1995Yes
00Jan 12, 1984Oct 6, 1983—
00Jan 12, 1984Feb 18, 1980—
00Jan 12, 1984Dec 26, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28730573, documented in the API reference.