WELL · 42-287-30620 · DISTRICT 3
Gantt T. K. A #1
Lee County · Giddings (Austin Chalk-3) field · Vertical
Gantt T. K. A #1 (API 42-287-30620) is a plugged well in Lee County, plugged April 1, 1998, last operated by Gantt Operating Company Inc..
The RRC has issued one drilling permit, issued December 31, 1979, permitted to 8,100 ft.
It was permitted by Nucorp Energy, Inc. and has since transferred to Gantt Operating Company Inc. on the wellbore schedule.
Completion filings report 4 formation tops, including Midway, Navarro, Taylor, Austin Chalk.
Its lease has reported 2 barrels of oil since January 1993, last reporting in March 2008.
Operator of record
Permitted by Nucorp Energy, Inc.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed May 4, 2026 · 3 permits on file · (281) 384-1972
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Gantt Operating Company Inc. |
| Production reports | Gantt Operating Company, Inc.through Apr 1998 |
| Latest permit | Nucorp Energy, Inc.Dec 31, 1979 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,100
- total depth, ft
- 1
- permits on file
- Dec 31, 1979
- last permit issued
- Oct 26, 1985
- completed
- 2
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 26, 1985
- Shut in
- —
- Plugged
- Apr 1, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Gantt, T. K. "A" O-3-12763 | Giddings (Austin Chalk-3) | Gantt Operating Company, Inc. | 1 | 2 | 0 | Jan 1993 – Mar 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Gantt Operating Company, Inc.Apr 1998 → Apr 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 67885-99 | Drill | Nucorp Energy, Inc. | Dec 31, 1979 | Dec 31, 1979 | — | 8,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-12763 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 340 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Midway | 4,455 | -4,115 |
| Navarro | 5,188 | -4,848 |
| Taylor | 7,010 | -6,670 |
| Austin Chalk | 7,176 | -6,836 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,230 | 7,409 | Perforated |
| 7,740 | 7,760 | Perforated |
| 7,772 | 7,797 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 550 | 12.25 | 400 S |
| 2.875 | 6,824 | — | — |
| 5.5 | 7,230 | 8.75 | 2,150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 10, 1985 | Nov 4, 1985 | — |
| 00 | Jan 12, 1984 | Mar 3, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-287-30620 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-287-30620 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28730620, documented in the API reference.