WELL · 42-287-30665 · DISTRICT 3
Morgen Mary #2
Lee County · Railroad (Navarro) field · Vertical
Morgen Mary #2 (API 42-287-30665) is a plugged well in Lee County, plugged August 26, 1999, last operated by Wcs Oil And Gas Corporation.
The RRC has issued 3 drilling permits between 1980 and 1987, permitted to 7,945 ft.
Completion filings report 4 formation tops, including Midway, Navarro, Taylor, Austin Chalk.
Its lease has reported 9.36K barrels of oil and 18.2K mcf of gas since January 1993, last reporting in October 1999.
Operator of record
Dallas, TX · P-5 Y, filed Jan 7, 2005 · 277 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | WCS Oil and Gas Corporation |
| Production reports | WCS Oil and Gas Corporationthrough Dec 1996 |
| Latest permit | WCS Oil and Gas CorporationOct 23, 1987 |
- 7,945
- total depth, ft
- 3
- permits on file
- Oct 23, 1987
- last permit issued
- Oct 13, 1983
- completed
- 9.36K
- cumulative oil, bbl
- 18.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 1999
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 13, 1983
- Shut in
- —
- Plugged
- Aug 26, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Morgan, Mary O-3-19893 | Giddings (Austin Chalk-3) | WCS Oil and Gas Corporation | 1 | 9.36K | 18.2K | Jan 1993 – Oct 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1WCS Oil and Gas CorporationJan 1993 → Nov 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 337826-99 | Recompletion | WCS Oil and Gas Corporation | Oct 23, 1987 | Oct 23, 1987 | — | 7,945 |
| 209948-99 | Recompletion | Nucorp Energy, Inc. | Aug 2, 1983 | Sep 2, 1983 | — | 5,400 |
| 77636-99 | Drill | Nucorp Energy, Inc. | Apr 7, 1980 | Apr 7, 1980 | Apr 7, 1980 | 7,850 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-19893 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 341 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Midway | 4,410 | -4,069 |
| Navarro | 5,125 | -4,784 |
| Taylor | 7,000 | -6,659 |
| Austin Chalk | 7,194 | -6,853 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,161 | 5,166 | Perforated |
| 7,238 | 7,374 | Perforated |
| 7,704 | 7,818 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 540 | 12.25 | 450 S |
| 2.875 | 5,140 | — | — |
| 5.5 | 6,221 | 8.75 | 300 S |
| 2.875 | 7,011 | — | — |
| 5.5 | 7,221 | 8.75 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 4, 1988 | Nov 20, 1987 | Yes |
| 00 | Dec 19, 1987 | — | — |
| 00 | Jan 12, 1984 | Oct 31, 1983 | — |
| 00 | Jan 12, 1984 | Jul 8, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-287-30665 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-287-30665 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28730665, documented in the API reference.