WELL · 42-287-30737 · DISTRICT 3

Rivers #1

N

Lee County  · Horizontal · Sidetrack

Rivers #1 (API 42-287-30737) is a permitted horizontal well in Lee County filed by Gemini Exploration Company; no completion report is on file yet.

The RRC has issued 3 drilling permits between 1980 and 1994, permitted to 9,500 ft.

Completion filings report 5 formation tops, including Navarro, Taylor, Pecan Gap, Austin Chalk.

Its lease has reported 24.9K barrels of oil and 295K mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Gemini Exploration Company

Dallas, TX · P-5 Y, filed Apr 14, 2000 · 174 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsMagnolia Oil & Gas Operating LLCthrough Mar 2024
Latest permitGemini Exploration CompanyNov 10, 1994
9,500
total depth, ft
3
permits on file
Nov 10, 1994
last permit issued
—
completed
24.9K
cumulative oil, bbl
295K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rivers O-3-16688Giddings (Austin Chalk-3)Magnolia Oil & Gas Operating LLC124.9K295KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

02040202420252026

Oil, barrels lease total

Last 12 months 0 · prior 12 0

01020202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 13 G Investments, Inc.Jan 1993 → Oct 1993
  2. 2Gemini Exploration CompanyOct 1994 → Apr 1995
  3. 3Union Pacific Austin Chalk Co.May 1995 → Jan 2001
  4. 4Rme Austin Chalk CompanyFeb 2001 → Nov 2002
  5. 5Anadarko Austin Chalk CompanyDec 2002 → Feb 2006
  6. 6Anadarko E&P Company LPMar 2006 → Jul 2007
  7. 7Enervest Operating, L.L.C.Aug 2007 → Jul 2018
  8. 8Magnolia Oil & Gas Operating LLCAug 2018 → Mar 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
429940-99Recompletion · sidetrackGemini Exploration CompanyNov 10, 1994Nov 10, 1994Nov 11, 19948,900
196194-99OtherWCS Petroleum CompanyApr 11, 1983Apr 11, 1983—9,500
88187-99DrillMosbacher-Transco Expl-W.E. CarlJul 8, 1980Jul 8, 1980Jul 12, 19809,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-16688————

Formation tops

As filed on W-2/G-1. Subsea from 394 ft elevation.Download CSV →

FormationMD ftSubsea
NavarroNAVARRO 'A'5,829-5,435
TaylorTAYLOR SAND6,470-6,076
Pecan Gap7,316-6,922
Austin Chalk7,759-7,365
Austin Chalk7,762-7,368
Eagle FordEAGLEFORD8,560-8,166

Perforations

Perforated and open-hole intervals.

FromToType
7,8387,837Perforated
7,9508,095Perforated
8,2358,233Perforated
8,8508,505Perforated
10,2468,463Perforated
10,4008,599Perforated
10,4258,451Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,50012.251,450 S
2.8757,650——
77,8908.75305 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 7, 1995Jan 5, 1995Yes
00Jun 27, 1986Dec 16, 1985Yes
00Jan 12, 1984Jul 5, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28730737, documented in the API reference.