WELL · 42-287-30798 · DISTRICT 3

Simek, Vlasta #1RE

N

Lee County  · Horizontal · Sidetrack

Simek, Vlasta #1RE (API 42-287-30798) is a permitted horizontal well in Lee County filed by Arrow Exploration Company; no completion report is on file yet.

The RRC has issued 5 drilling permits between 1980 and 2001, permitted to 9,000 ft.

Completion filings report 4 formation tops, including Pecan Gap, Austin Chalk, Eagle Ford, Engleford.

Its lease has reported 94.3K barrels of oil and 60K mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Arrow Exploration Company

Plano, TX · P-5 Y, filed Feb 6, 2009 · 36 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsMagnolia Oil & Gas Operating LLCthrough Apr 2026
Latest permitArrow Exploration CompanyMay 2, 2001
9,000
total depth, ft
5
permits on file
May 2, 2001
last permit issued
—
completed
94.3K
cumulative oil, bbl
60K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Simek, Vlasta Unit O-3-13614Giddings (Austin Chalk-3)Magnolia Oil & Gas Operating LLC294.3K60KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 1,136 · prior 12 1,312(-13%)

0200400600202420252026

Gas, mcf lease total

Last 12 months 710 · prior 12 944(-25%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Orr Production CompanyJan 1993 → Aug 1994
  2. 2Gemini Exploration CompanyNov 1994 → Apr 1995
  3. 3Union Pacific Austin Chalk Co.Aug 1995 → Apr 1996
  4. 4Arrow Exploration CompanyMar 2000 → Dec 2004
  5. 5Emerald Operating Company, Inc.Jan 2005 → Aug 2008
  6. 6Enervest Operating, L.L.C.Sep 2008 → Jul 2018
  7. 7Magnolia Oil & Gas Operating LLCAug 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
508436-99Recompletion · sidetrackArrow Exploration CompanyMay 2, 2001May 2, 2001Apr 28, 20018,000
492409-99Recompletion · sidetrackArrow Exploration CompanyFeb 24, 2000Feb 24, 2000Feb 24, 20007,700
445712-99Recompletion · sidetrackUnion Pacific Austin Chalk Co.Mar 8, 1996Mar 11, 1996—8,200
135730-99RecompletionHumble Exploration Co., Inc.Oct 7, 1981Oct 7, 1981—9,000
93715-99DrillHumble Exploration Co., Inc.Sep 24, 1980Sep 24, 1980—9,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-13614————
—— O-3-13614————

Formation tops

As filed on W-2/G-1. Subsea from 280 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap6,500-6,220
Austin Chalk7,032-6,752
Eagle FordEAGLEFORD7,752-7,472
Engleford7,752-7,472

Perforations

Perforated and open-hole intervals.

FromToType
7,0797,601Perforated
7,2808,796Perforated
7,73910,350Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,12512.251,500 S
2.3757,003——
5.57,9728.751,055 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 17, 2002Jul 17, 2001Yes
00Dec 19, 2001May 19, 2000Yes
00Jul 20, 2000May 19, 2000Yes
00Jan 12, 1984Dec 10, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28730798, documented in the API reference.