WELL · 42-287-30839 · DISTRICT 3

Adeena #1

Plugged

Lee County · Railroad (Navarro) field  · Vertical

Adeena #1 (API 42-287-30839) is a plugged well in Lee County, plugged August 30, 1985, last operated by U. S. Operating Inc..

The RRC has issued 2 drilling permits between 1980 and 1984, permitted to 9,000 ft.

Completion filings report 4 formation tops, including Navarro, Pecan Gap, Austin Chalk, Eagle Ford.

Operator of record

U. S. Operating Inc.

Dallas, TX · P-5 Inactive, filed Nov 18, 2024 · 495 permits on file · (214) 891-3300

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleU. S. Operating Inc.
Production reportsnone
Latest permitU. S. Operating, Inc.Mar 7, 1984
9,000
total depth, ft
2
permits on file
Mar 7, 1984
last permit issued
Feb 29, 1984
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 29, 1984
Shut in
—
Plugged
Aug 30, 1985

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
231611-99RecompletionU. S. Operating, Inc.Mar 7, 1984Mar 7, 1984—8,315
104767-99DrillU. S. Operating, Inc.Dec 31, 1980Dec 31, 1980—9,000

Formation tops

As filed on W-2/G-1. Subsea from 335 ft elevation.Download CSV →

FormationMD ftSubsea
Navarro5,666-5,331
Pecan Gap7,025-6,690
Austin Chalk7,500-7,165
Eagle FordEAGLEFORD8,240-7,905

Perforations

Perforated and open-hole intervals.

FromToType
5,6665,686Perforated
7,5998,225Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,15412.25470 S
77,3958.75200 S
2.3757,590——
7—8.75700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 10, 1984Mar 12, 1984—
00Mar 27, 1984Mar 12, 1984—
00Jan 12, 1984Oct 22, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28730839, documented in the API reference.