WELL · 42-287-30990 · DISTRICT 3

Emmitt P. Wolz Trustee #3

Plugged

Lee County · Giddings (Navarro Oil) field  · Vertical

Emmitt P. Wolz Trustee #3 (API 42-287-30990) is a plugged well in Lee County, plugged July 1, 1986, last operated by Champlin Exploration Inc..

The RRC has issued 2 drilling permits between 1981 and 1984, permitted to 8,300 ft.

Completion filings report 3 formation tops, including Navarro, Pecan Gap, Austinchalk.

Operator of record

Champlin Exploration Inc.

Enid, OK · P-5 Y, filed Nov 2, 2018 · 196 permits on file · (580) 541-1754

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleChamplin Exploration Inc.
Production reportsnone
Latest permitChamplin Exploration, Inc.Oct 15, 1984
8,300
total depth, ft
2
permits on file
Oct 15, 1984
last permit issued
Jun 21, 1984
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 21, 1984
Shut in
—
Plugged
Jul 1, 1986

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
254441-99RecompletionChamplin Exploration, Inc.Oct 12, 1984Oct 15, 1984—7,910
124237-99DrillChamplin Exploration, Inc.Jul 8, 1981Jul 8, 1981—8,300

Formation tops

As filed on W-2/G-1. Subsea from 281 ft elevation.Download CSV →

FormationMD ftSubsea
Navarro5,250-4,969
Pecan Gap6,690-6,409
Austinchalk7,230-6,949

Perforations

Perforated and open-hole intervals.

FromToType
5,2425,288Perforated
7,7477,910Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6254,03012.251,275 S
5.57,6537.875150 S
2.3757,812——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 9, 1985Oct 22, 1984—
00Dec 15, 1984——
00Jan 12, 1984Dec 3, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28730990, documented in the API reference.