WELL · 42-287-31198 · DISTRICT 3

Smith Phillip #2

Plugged

Lee County · Raccoon Ridge (Navarro C) field  · Vertical

Smith Phillip #2 (API 42-287-31198) is a plugged well in Lee County, plugged November 29, 2005, last operated by Micro Operating Inc..

The RRC has issued one drilling permit, issued March 9, 1982, permitted to 4,000 ft.

It was permitted by Austin Oil & Mineral and has since transferred to Micro Operating Inc. on the wellbore schedule.

Its lease has reported 1.47K barrels of oil and 21 mcf of gas since January 1993, last reporting in February 2006.

Operator of record

Micro Operating Inc.

Permitted by Austin Oil & Mineral; the EWA schedule now lists a different operator.

Tomball, TX · P-5 Y, filed Jul 4, 2026 · 2 permits on file · (832) 246-2429

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMicro Operating Inc.
Production reportsMicro Operating, Inc.through Feb 2005
Latest permitAustin Oil & MineralMar 9, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,000
total depth, ft
1
permits on file
Mar 9, 1982
last permit issued
Apr 13, 1982
completed
1.47K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2006

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 13, 1982
Shut in
—
Plugged
Nov 29, 2005

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Smith, Phillip O-3-15914Raccoon Ridge (Navarro C)Micro Operating, Inc.11.47K21Jan 1993 – Feb 2006

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1C S J, Inc.Jan 1993 → Mar 1996
  2. 2Wehunt Oil Company, Inc.May 1996 → Oct 2002
  3. 3Micro Operating, Inc.May 2003 → Feb 2005

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
152639-99DrillAustin Oil & MineralMar 9, 1982Mar 9, 1982—4,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-15914————

Perforations

Perforated and open-hole intervals.

FromToType
3,6183,626Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62515812.25153 S
2.3753,560——
4.53,6446.2591 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Aug 30, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28731198, documented in the API reference.