WELL · 42-287-31205 · DISTRICT 3
Chanie Collier Unit #1
Lee County · Giddings (Buda) field · Vertical
Chanie Collier Unit #1 (API 42-287-31205) is a plugged well in Lee County, plugged April 1, 1986, last operated by Edsel Robert M. Inc..
The RRC has issued 2 drilling permits between 1982 and 1984, permitted to 9,200 ft.
It was permitted by General Production Company, Inc. and has since transferred to Edsel Robert M. Inc. on the wellbore schedule.
Completion filings report 5 formation tops, including Wilcox, Navarro, Pecan Gap, Austin Chalk.
Operator of record
Permitted by General Production Company, Inc.; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Aug 15, 1988 · 5 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Edsel Robert M. Inc. |
| Production reports | none |
| Latest permit | General Production Company, Inc.Jun 14, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,200
- total depth, ft
- 2
- permits on file
- Jun 14, 1984
- last permit issued
- Jun 14, 1984
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 14, 1984
- Shut in
- —
- Plugged
- Apr 1, 1986
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 242334-99 | Recompletion | General Production Company, Inc. | Jun 14, 1984 | Jun 14, 1984 | — | 8,405 |
| 153595-99 | Drill | General Prod. Corp. | Mar 10, 1982 | Mar 10, 1982 | — | 9,200 |
Formation tops
As filed on W-2/G-1. Subsea from 398 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| WilcoxBASE WILCOX | 4,400 | -4,002 |
| Navarro | 5,200 | -4,802 |
| Pecan Gap | 6,750 | -6,352 |
| Austin Chalk | 7,360 | -6,962 |
| Buda | 8,275 | -7,877 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,400 | 8,000 | Perforated |
| 8,275 | 8,308 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,200 | 12.25 | 535 S |
| 7 | 7,300 | — | 275 S |
| 7 | 7,300 | 8.75 | 815 sx |
| 2.375 | 8,256 | — | — |
| 5 | 8,375 | 6.125 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 23, 1984 | Jul 5, 1984 | — |
| 00 | Jul 18, 1984 | Jul 5, 1984 | — |
| 00 | Jan 12, 1984 | Jun 25, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-287-31205 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-287-31205 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28731205, documented in the API reference.