WELL · 42-287-31252 · DISTRICT 3
Lanetta #2
Lee County · Giddings (Austin Chalk-3) field · Vertical
Lanetta #2 (API 42-287-31252) is a well in Lee County operated by Bhec Corporation, completed July 21, 1982.
The RRC has issued one drilling permit (amended once), issued May 26, 1982, permitted to 9,300 ft.
It was permitted by Union Pacific Resources Company and has since transferred to Bhec Corporation on the wellbore schedule.
Its lease has reported 48K barrels of oil and 106K mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Permitted by Union Pacific Resources Company; the EWA schedule now lists a different operator.
Giddings, TX · P-5 Y, filed Jan 4, 2026
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Bhec Corporation |
| Production reports | Magnolia Oil & Gas Operating LLCthrough Nov 2023 |
| Latest permit | Santa FE - Windsor Producing Co.May 26, 1982 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,300
- total depth, ft
- 2
- permits on file
- May 26, 1982
- last permit issued
- Jul 21, 1982
- completed
- 48K
- cumulative oil, bbl
- 106K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 21, 1982
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Lanetta O-3-19544 | Giddings (Austin Chalk-3) | Magnolia Oil & Gas Operating LLC | 1 | 48K | 106K | Jan 1993 – Jul 2026 |
Gas, mcf lease total
Last 12 months 0 · prior 12 0
Oil, barrels lease total
Last 12 months 0 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Union Pacific Resources CompanyJan 1993 → Jan 2001
- 2Rme Petroleum CompanyFeb 2001 → Nov 2002
- 3Anadarko E&P Company LPDec 2002 → Aug 2007
- 4Enervest Operating, L.L.C.Sep 2007 → Jul 2018
- 5Magnolia Oil & Gas Operating LLCAug 2018 → Jun 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 161833-98 | Drill | Union Pacific Resources Company | Dec 13, 1994 | May 26, 1982 | — | 9,092 |
| 161833-99 | Drill | Santa FE - Windsor Producing Co. | May 26, 1982 | May 26, 1982 | May 22, 1982 | 9,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-19544 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,736 | 8,918 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,977 | 8.75 | 950 S |
| 7 | 8,241 | 8.75 | 350 S |
| 2.375 | 8,633 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 12, 1987 | Aug 5, 1982 | — |
| 00 | Mar 11, 1987 | — | — |
| 00 | Jan 12, 1984 | Aug 5, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-287-31252 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-287-31252 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28731252, documented in the API reference.