WELL · 42-287-31367 · DISTRICT 3
Dube Louise #1
Lee County · Hooker Creek (Navarro A) field · Producing · Vertical
Dube Louise #1 (API 42-287-31367) is a well in Lee County operated by Lindow Oil & Gas LLC, completed May 7, 1983 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued April 26, 1983, permitted to 5,200 ft.
It was permitted by Aegean Oil Corp. and has since transferred to Lindow Oil & Gas LLC on the wellbore schedule.
Its lease has reported 9.19K barrels of oil and 72.9K mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Permitted by Aegean Oil Corp.; the EWA schedule now lists a different operator.
Caldwell, TX · P-5 Y, filed Aug 4, 2025 · 1 permits on file · (281) 250-7217
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Lindow Oil & Gas LLC |
| Production reports | Lindow Oil & Gas, LLCthrough Mar 2026 |
| Latest permit | Aegean Oil Corp.Apr 26, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,200
- total depth, ft
- 1
- permits on file
- Apr 26, 1983
- last permit issued
- May 7, 1983
- completed
- 9.19K
- cumulative oil, bbl
- 72.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 7, 1983
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Dube, Louise O-3-16517 | Hooker Creek (Navarro A) | Lindow Oil & Gas, LLC | 1 | 9.19K | 72.9K | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 7 · prior 12 8(-12%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Tiza, Inc.Jan 1993 → Jan 1993
- 2Tiza Operating CompanyFeb 1993 → Oct 1993
- 3Osr Oil & Gas CompanyNov 1993 → May 1998
- 4Mec Energy CorporationApr 1995 → Sep 1995
- 5West Texas Operating Company,llcJun 1998 → Jan 1999
- 6Core Energy CorporationFeb 1999 → Jun 1999
- 7Core E & P Corp.Jul 1999 → Aug 2001
- 8Penntex Petroleum CorporationSep 2001 → Aug 2014
- 9Temprano Energy CorporationSep 2014 → Jun 2017
- 10Lindow Oil & Gas, LLCAug 2018 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 192745-99 | Drill | Aegean Oil Corp. | Apr 26, 1983 | Apr 26, 1983 | Apr 29, 1983 | 5,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-16517 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,665 | 4,686 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 162 | 12.25 | 125 S |
| 2.375 | 4,459 | — | — |
| 4.5 | 4,991 | 7.875 | 971 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | May 18, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-287-31367 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-287-31367 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28731367, documented in the API reference.