WELL · 42-287-31656 · DISTRICT 3

Michalk #1

N

Lee County · Giddings (Austin Chalk-3) field  · Horizontal · Sidetrack

Michalk #1 (API 42-287-31656) is a horizontal well in Lee County operated by Great West Energy & Expl. Inc., completed August 11, 1984.

The RRC has issued 2 drilling permits between 1984 and 1995, permitted to 9,800 ft.

Completion filings report 8 formation tops, including Navarro, Pecan Gap, Austin Chalk, Eagle Ford.

Its 2 leases have reported 20.2K barrels of oil and 43.8K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Great West Energy & Expl. Inc.

Addison, TX · P-5 Y, filed Mar 2, 2007 · 32 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGreat West Energy & Expl. Inc.
Production reportsIronroc Energythrough Jan 2021
Latest permitGreat West Energy & Expl., Inc.Jul 3, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,800
total depth, ft
2
permits on file
Jul 3, 1995
last permit issued
Aug 11, 1984
completed
20.2K
cumulative oil, bbl
43.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 11, 1984
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
State of Texas/Kuehn OL Unit #1 O-3-22818Giddings (Austin Chalk-3)Ironroc Energy119.5K43.8KAug 1995 – Jul 2026
Michalk O-3-17999Giddings (Austin Chalk-3)Great West Energy & Expl., Inc.170217Jan 1993 – Mar 2008

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bass PetroleumJan 1993 → May 1994
  2. 2Great West Energy & Expl., Inc.Aug 1995 → Dec 1996
  3. 3Stanton Mineral Development IncApr 1999 → Jan 2002
  4. 4Atkinson Energy CorporationFeb 2002 → Sep 2002
  5. 5Square One CorporationApr 2004 → Nov 2011
  6. 6Ironroc EnergyNov 2019 → Jan 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
436539-99Recompletion · sidetrackGreat West Energy & Expl., Inc.Jun 5, 1995Jul 3, 1995Jul 14, 19959,235
242376-99DrillSanta FE Minerals, Inc.Jun 29, 1984Jun 18, 1984Jul 3, 19849,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-17999————
—— O-3-22818————

Formation tops

As filed on W-2/G-1. Subsea from 468 ft elevation.Download CSV →

FormationMD ftSubsea
NavarroNAVARRO #16,240-5,772
NavarroTOP NAVARRO #26,265-5,797
NavarroNAVARRO #26,875-6,407
Pecan Gap7,773-7,305
Austin Chalk8,180-7,712
Eagle FordEAGLEFORD8,945-8,477
False Buda9,090-8,622
BudaBUDA RESERVOIR9,120-8,652
Del Rio9,160-8,692
Georgetown9,185-8,717

Perforations

Perforated and open-hole intervals.

FromToType
8,51510,980Perforated
8,57610,762Perforated
8,7888,932Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,97112.25950 S
5.59,2258.75500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 22, 1999Oct 15, 1999—
00Dec 11, 1995Sep 21, 1995Yes
00Nov 20, 1995Oct 15, 1984—
00Oct 31, 1984Oct 15, 1984—
00Oct 24, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28731656, documented in the API reference.