WELL · 42-287-31710 · DISTRICT 3

Tarver Unit #1

N

Lee County · Giddings (Austin Chalk-3) field  · Horizontal · Sidetrack

Tarver Unit #1 (API 42-287-31710) is a horizontal well in Lee County operated by Arrow Exploration Company, completed August 10, 1995.

The RRC has issued 3 drilling permits between 1984 and 1996, permitted to 10,000 ft.

Completion filings report 3 formation tops, including Pecan Gap, Austin Chalk, Eagle Ford.

Its 2 leases have reported 2.17K barrels of oil and 1.88M mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Arrow Exploration Company

Plano, TX · P-5 Y, filed Feb 6, 2009 · 36 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleArrow Exploration Company
Production reportsMagnolia Oil & Gas Operating LLCthrough Jun 2025
Latest permitArrow Exploration CompanyJan 9, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,000
total depth, ft
3
permits on file
Jan 9, 1996
last permit issued
Aug 10, 1995
completed
2.17K
cumulative oil, bbl
1.88M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 10, 1995
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tarver G-3-157285Giddings (Austin Chalk, Gas)Magnolia Oil & Gas Operating LLC101.84MOct 1995 – Jul 2026
Tarver Unit O-3-18541Giddings (Austin Chalk-3)Arrow Exploration Company12.17K46.3KJan 1993 – May 1996

Gas, mcf lease total

Last 12 months 12 · prior 12 1,298(-99%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1County Management, Inc.Jan 1993 → Apr 1993
  2. 2Anchor Operating Co.May 1993 → Jun 1993
  3. 3Bracy, Adolphus BuilderJan 1994 → Apr 1994
  4. 4Arrow Exploration CompanyAug 1995 → Dec 2004
  5. 5Emerald Operating Company, Inc.Jan 2005 → Aug 2008
  6. 6Enervest Operating, L.L.C.Sep 2008 → Jul 2018
  7. 7Magnolia Oil & Gas Operating LLCAug 2018 → Jun 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
443561-99Recompletion · sidetrackArrow Exploration CompanyJan 9, 1996Jan 9, 1996Oct 4, 19959,500
438241-99Recompletion · sidetrackArrow Exploration CompanyJul 26, 1995Jul 26, 1995Oct 4, 19959,500
252120-99DrillWCS Oil and Gas CorporationFeb 22, 1985Sep 20, 1984Mar 27, 198510,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-157285————
—— O-3-18541————

Formation tops

As filed on W-2/G-1. Subsea from 312 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap7,675-7,363
Austin Chalk8,312-8,000
Eagle FordEAGLEFORD8,958-8,646

Perforations

Perforated and open-hole intervals.

FromToType
8,6048,953Perforated
8,60511,035Perforated
8,6129,076Perforated
8,7578,944Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,00912.25400 S
5.58,6198.75990 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 3, 1996Nov 3, 1995Yes
00Mar 25, 1996——
00Jan 31, 1996Sep 12, 1995Yes
00May 30, 1985May 6, 1985—
00May 25, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28731710, documented in the API reference.