WELL · 42-287-31818 · DISTRICT 3

Joe #1

Plugged

Lee County · Hooker Creek (Navarro A) field  · Vertical

Joe #1 (API 42-287-31818) is a plugged well in Lee County, plugged February 18, 1994, last operated by Bar-Mac Investments Inc..

The RRC has issued one drilling permit, issued June 24, 1985, permitted to 5,400 ft.

It was permitted by Hollub, Lambert Drilling Company and has since transferred to Bar-Mac Investments Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Wilcox, Top Poth, Base Poth.

Operator of record

Bar-Mac Investments Inc.

Permitted by Hollub, Lambert Drilling Company; the EWA schedule now lists a different operator.

Brenham, TX · P-5 Y, filed Aug 4, 2017 · 70 permits on file · (979) 219-2586

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBar-Mac Investments Inc.
Production reportsBar-Mac Investments Inc.through Jan 1994
Latest permitHollub, Lambert Drilling CompanyJun 24, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,400
total depth, ft
1
permits on file
Jun 24, 1985
last permit issued
Jul 10, 1985
completed
0
cumulative oil, bbl
339
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 1994

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 10, 1985
Shut in
—
Plugged
Feb 18, 1994

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Joe G-3-142184Hooker Creek (Navarro A)Bar-Mac Investments Inc.10339Jan 1993 – Jun 1994
Joe O-3-18699Hooker Creek (Navarro A)Bar-Mac Investments Inc.100Jan 1993 – May 1994

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bar-Mac Investments Inc.Jan 1993 → Jan 1994

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
278536-99DrillHollub, Lambert Drilling CompanyJun 24, 1985Jun 24, 1985—5,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-142184————
—— O-3-18699————

Formation tops

As filed on W-2/G-1. Subsea from 291 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxBASE WILCOX4,100-3,809
Top Poth4,150-3,859
Base Poth4,300-4,009

Perforations

Perforated and open-hole intervals.

FromToType
4,9244,958Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62551012.25215 S
4.55,0757.875880 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 23, 1992Jul 31, 1992—
00Sep 9, 1992——
00Aug 30, 1985Jul 29, 1985—
00Aug 24, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28731818, documented in the API reference.