WELL · 42-287-32057 · DISTRICT 3
Marquis #2
Lee County · Serbin (Taylor Sand) field · Vertical
Marquis #2 (API 42-287-32057) is a plugged well in Lee County, plugged November 21, 2014, last operated by Riley Exploration Opg CO LLC.
The RRC has issued one drilling permit, issued April 13, 1987, permitted to 5,800 ft.
It was permitted by Nobleson Operating, Inc. and has since transferred to Riley Exploration Opg CO LLC on the wellbore schedule.
Completion filings report one formation top, including Taylor.
Its lease has reported 4.04K barrels of oil and 10.8K mcf of gas since January 1993, last reporting in March 2016.
Operator of record
Permitted by Nobleson Operating, Inc.; the EWA schedule now lists a different operator.
LA Grange, TX · P-5 Y, filed Nov 2, 2018 · 63 permits on file · (405) 485-8200
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Riley Exploration Opg Co LLC |
| Production reports | Bass Petroleum, Incthrough Dec 2013 |
| Latest permit | Nobleson Operating, Inc.Apr 13, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,800
- total depth, ft
- 1
- permits on file
- Apr 13, 1987
- last permit issued
- May 20, 1987
- completed
- 4.04K
- cumulative oil, bbl
- 10.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2016
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 20, 1987
- Shut in
- —
- Plugged
- Nov 21, 2014
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Marquis O-3-19662 | Serbin (Taylor Sand) | Riley Exploration Opg Co, LLC | 1 | 4.04K | 10.8K | Jan 1993 – Mar 2016 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Scott Petroleum, Inc.Jan 1993 → Jun 1994
- 2Bass Petroleum, IncJul 1994 → Dec 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 328804-99 | Drill | Nobleson Operating, Inc. | Apr 9, 1987 | Apr 13, 1987 | — | 5,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-19662 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 482 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| TaylorTAYLOR SAND | 5,330 | -4,848 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,358 | 5,374 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 646 | 12.25 | 400 S |
| 4.5 | 5,508 | 7.875 | 1,318 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 2, 1987 | Jun 19, 1987 | Yes |
| 00 | Jun 29, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-287-32057 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-287-32057 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28732057, documented in the API reference.