WELL · 42-287-32196 · DISTRICT 3

Marmo Unit #2

N

Lee County · Hooker Creek (Navarro A) field  · Vertical

Marmo Unit #2 (API 42-287-32196) is a well in Lee County operated by Ernest Operating Company, completed September 6, 1988.

The RRC has issued one drilling permit, issued April 6, 1988, permitted to 5,400 ft.

It was permitted by Bar-Mac Investments Inc. and has since transferred to Ernest Operating Company on the wellbore schedule.

Completion filings report 5 formation tops, including Hooker Creek (Navarro A), Nacarro A, Navarro, Hooker Creek (Navarro B).

Its 2 leases have reported 22.6K barrels of oil and 108K mcf of gas since January 1993, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Ernest Operating Company

Permitted by Bar-Mac Investments Inc.; the EWA schedule now lists a different operator.

Rockdale, TX · P-5 Y, filed Jan 4, 2026 · 32 permits on file · (512) 446-3855

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleErnest Operating Company
Production reportsErnest Operating Companythrough Apr 2026
Latest permitBar-Mac Investments Inc.Apr 6, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,400
total depth, ft
1
permits on file
Apr 6, 1988
last permit issued
Sep 6, 1988
completed
22.6K
cumulative oil, bbl
108K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 6, 1988
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Marmo Unit O-3-20089Hooker Creek (Navarro A)Ernest Operating Company322.6K108KJan 1993 – Jul 2026
Marmo Unit G-3-288647Hooker Creek (Navarro A)Ernest Operating Company100Nov 2019 – May 2020

Oil, barrels lease total

Last 12 months 648 · prior 12 593(+9%)

0100200202420252026

Gas, mcf lease total

Last 12 months 1,410 · prior 12 675(+109%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bar-Mac Investments Inc.Jan 1993 → Jun 2015
  2. 2Ernest Operating CompanyFeb 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
344757-99DrillBar-Mac Investments Inc.Apr 4, 1988Apr 6, 1988—5,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-288647————
—— O-3-20089————
—— O-3-20089————

Formation tops

As filed on W-2/G-1. Subsea from 284 ft elevation.Download CSV →

FormationMD ftSubsea
Hooker Creek (Navarro A)5,014-4,730
Nacarro A5,014-4,730
NavarroNAVARRO A5,014-4,730
Hooker Creek (Navarro B)——
Wildcat——

Perforations

Perforated and open-hole intervals.

FromToType
5,0145,066Perforated
5,0145,066Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62555312.25302 S
5.55,2127.8751,020 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 11, 2020May 11, 2020—
00Apr 30, 2020Dec 2, 2019Yes
00Oct 10, 1988Sep 22, 1988Yes
00Sep 30, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28732196, documented in the API reference.