WELL · 42-287-32418 · DISTRICT 3

Branch-Smith Unit No. 1 #7H

Y

Lee County · Giddings (Austin Chalk-3) field · Shut IN  · Horizontal

Branch-Smith Unit NO. 1 #7H (API 42-287-32418) is a horizontal well in Lee County operated by Senora Resources Inc., completed August 20, 2003 and listed as shut in on the RRC schedule.

The RRC has issued 2 drilling permits between 1994 and 2003, permitted to 13,000 ft.

It was permitted by Holifield Oil Company and has since transferred to Senora Resources Inc. on the wellbore schedule.

Completion filings report one formation top, including Austin Chalk.

Its lease has reported 292K barrels of oil and 2.84M mcf of gas since January 1993, last reporting in July 2026. The lease carries 8 wells, so these are lease totals, not this well alone.

Operator of record

Senora Resources Inc.

Permitted by Holifield Oil Company; the EWA schedule now lists a different operator.

Dime Box, TX · P-5 Y, filed Mar 4, 2026 · 15 permits on file · (979) 716-1678

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSenora Resources Inc.
Production reportsSenora Resources, Inc.through Dec 2023
Latest permitHolifield Oil CompanyJul 16, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,000
total depth, ft
2
permits on file
Jul 16, 2003
last permit issued
Aug 20, 2003
completed
292K
cumulative oil, bbl
2.84M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 20, 2003
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Branch-Smith Unit No. 1 O-3-15895Giddings (Austin Chalk-3)Senora Resources, Inc.8292K2.84MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

05001K202420252026

Oil, barrels lease total

Last 12 months 0 · prior 12 0

02040202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Dec 2010
  3. 3Senora Resources, Inc.Jan 2011 → Dec 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
534242-99RecompletionHolifield Oil CompanyJul 16, 2003Jul 16, 2003Jul 22, 20039,234
420869-99DrillExxon Corp.Feb 7, 1994Mar 2, 1994Apr 9, 199413,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-15895————

Formation tops

As filed on W-2/G-1. Subsea from 350 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk8,866-8,516
Austin Chalk8,868-8,518

Perforations

Perforated and open-hole intervals.

FromToType
8,92312,173Perforated
8,92512,405Perforated
8,95010,533Perforated
8,95012,096Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1660——
10.752,2134.751,325 S
10.752,21314.751,325 S
7.6258,9506.75250 S
7.6258,9509.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 24, 2004Dec 31, 2003Yes
00Nov 16, 1994Jun 7, 1994Yes
00Oct 27, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28732418, documented in the API reference.