WELL · 42-287-32457 · DISTRICT 3
Holmes Unit #1
Lee County · Giddings (Austin Chalk-3) field · Horizontal
Holmes Unit #1 (API 42-287-32457) is a plugged horizontal well in Lee County, plugged December 17, 1999, last operated by Mcdaniel Company Inc. The.
The RRC has issued one drilling permit, issued January 17, 1995, permitted to 8,100 ft.
It was permitted by Union Pacific Resources Company and has since transferred to Mcdaniel Company Inc. The on the wellbore schedule.
Completion filings report one formation top, including Austin Chalk.
Its lease has reported 16.8K barrels of oil and 16.5K mcf of gas since March 1995, last reporting in April 2000.
Operator of record
Permitted by Union Pacific Resources Company; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Mar 4, 2026 · 6 permits on file · (972) 392-9335
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | McDaniel Company Inc. The |
| Production reports | Union Pacific Resources Companythrough Jul 1999 |
| Latest permit | Union Pacific Resources CompanyJan 17, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,100
- total depth, ft
- 1
- permits on file
- Jan 17, 1995
- last permit issued
- Mar 31, 1995
- completed
- 16.8K
- cumulative oil, bbl
- 16.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1995 THROUGH Apr 2000
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 31, 1995
- Shut in
- —
- Plugged
- Dec 17, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Holmes Unit O-3-22702 | Giddings (Austin Chalk-3) | McDaniel Company, Inc., The | 1 | 16.8K | 16.5K | Mar 1995 – Apr 2000 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Union Pacific Resources CompanyMar 1995 → Jul 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 431686-99 | Drill | Union Pacific Resources Company | Jan 10, 1995 | Jan 17, 1995 | Mar 3, 1995 | 8,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-22702 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 488 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin Chalk | 6,766 | -6,278 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,050 | 10,936 | Perforated |
| 7,120 | 11,500 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,020 | 14.75 | 765 S |
| 7.625 | — | 9.875 | 475 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 6, 1995 | May 1, 1995 | Yes |
| 00 | May 30, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-287-32457 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-287-32457 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28732457, documented in the API reference.