WELL · 42-289-30314 · DISTRICT 5
Ward Seale et AL #1
Leon County · Pleasant Ridge (Woodbine) field · NO Production · Vertical
Ward Seale ET AL #1 (API 42-289-30314) is a well in Leon County operated by J.F.W. Equipment Inc., completed July 1, 1979 and listed as no production on the RRC schedule.
The RRC has issued one drilling permit, issued June 20, 1978, permitted to 7,800 ft.
It was permitted by Chase Oil & Gas, Inc. and has since transferred to J.F.W. Equipment Inc. on the wellbore schedule.
Its lease has reported 14.7K barrels of oil and 248 mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Permitted by Chase Oil & Gas, Inc.; the EWA schedule now lists a different operator.
Centerville, TX · P-5 Y, filed Jan 5, 2026 · (979) 324-9870
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | J.F.W. Equipment Inc. |
| Production reports | J.F.W. Equipment, Inc.through Jul 2024 |
| Latest permit | Chase Oil & Gas, Inc.Jun 20, 1978 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,800
- total depth, ft
- 1
- permits on file
- Jun 20, 1978
- last permit issued
- Jul 1, 1979
- completed
- 14.7K
- cumulative oil, bbl
- 248
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 1, 1979
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Ward, Seale, et AL O-5-2123 | Pleasant Ridge (Woodbine) | J.F.W. Equipment, Inc. | 1 | 14.7K | 248 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 0 · prior 12 80(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hughey, Gaylord T. Sr. Oper. Co.Jan 1993 → Jan 1997
- 2Basa Resources, Inc.Apr 1997 → Sep 2005
- 3Spicer Oil Company, Inc.Sep 2008 → Dec 2008
- 4Asm Oil & Gas Company, Inc.Jan 2009 → Aug 2009
- 5Amerril Energy LLCSep 2009 → Jun 2015
- 6J.F.W. Equipment, Inc.Jul 2018 → Jul 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 26966-99 | Drill | Chase Oil & Gas, Inc. | Jun 20, 1978 | Jun 20, 1978 | Feb 17, 1979 | 7,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-5-2123 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,008 | 7,052 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 320 | 12.25 | 250 S |
| 2.375 | 6,908 | — | — |
| 5.5 | 7,394 | 7.875 | 375 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Aug 17, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-289-30314 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-289-30314 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28930314, documented in the API reference.