WELL · 42-289-30921 · DISTRICT 5

Carter Trust #1A

N

Leon County · Alabama Ferry (Glenrose D ) field  · Vertical

Carter Trust #1A (API 42-289-30921) is a well in Leon County operated by Lasmo Energy Corporation, completed August 27, 1987.

The RRC has issued one drilling permit, issued July 23, 1987, permitted to 9,200 ft.

Completion filings report 10 formation tops, including Austin Chalk, Sub-Clarksville, Woodbine, Buda.

Its 2 leases have reported 3.49M barrels of oil and 14.5M mcf of gas since January 1993, last reporting in July 2026. The leases carry 70 wells, so these are lease totals, not this well alone.

Operator of record

Lasmo Energy Corporation

Houston, TX · P-5 Y, filed Jun 10, 1993 · 89 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLasmo Energy Corporation
Production reportsJay Management Company, LLCthrough Apr 2026
Latest permitLasmo Energy CorporationJul 23, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,200
total depth, ft
1
permits on file
Jul 23, 1987
last permit issued
Aug 27, 1987
completed
3.49M
cumulative oil, bbl
14.5M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 27, 1987
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 70 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Afnu O-5-3340Alabama Ferry (Glenrose "D")Jay Management Company, LLC703.49M14.5MJan 1993 – Jul 2026
— O-5-3139——000—

Oil, barrels lease total

Last 12 months 2,346 · prior 12 2,535(-7%)

0200400600202420252026

Gas, mcf lease total

Last 12 months 705 · prior 12 1,812(-61%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Torch Operating CompanyJan 1993 → Jun 1997
  2. 2Bargo Energy CompanyJul 1997 → Jan 1998
  3. 3Bledsoe Petro CorporationFeb 1998 → Jul 2000
  4. 4Phoenix Hydrocarbons OperatingAug 2000 → Sep 2008
  5. 5Jay Management Company, LLCOct 2008 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
333293-99DrillLasmo Energy CorporationJul 22, 1987Jul 23, 1987—9,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-5-3139————
—— O-5-3340————

Formation tops

As filed on W-2/G-1. Subsea from 288 ft elevation.Download CSV →

FormationMD ftSubsea
Austin ChalkTOP OF AUSTIN CHALK6,143-5,855
Sub-ClarksvilleSUB CLARKSVILLE6,420-6,132
Woodbine6,680-6,392
Buda7,380-7,092
Del RioDEL RIO SHALE7,455-7,167
Georgetown7,474-7,186
Kiamichi7,976-7,688
Edwards8,016-7,728
Paluxy8,400-8,112
Glen RoseGLEN ROSE "A"8,570-8,282
Glen RoseGLEN ROSE "B"8,706-8,418
Glen RoseGLEN ROSE "C"8,878-8,590
Glen RoseGLEN ROSE "D"8,995-8,707

Perforations

Perforated and open-hole intervals.

FromToType
9,0409,044Perforated
9,0519,063Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6253,13011530 S
5.59,1677.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 15, 1990Sep 4, 1987Yes
00Jul 11, 1990——
00Sep 25, 1987Sep 4, 1987Yes
00Sep 15, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28930921, documented in the API reference.