WELL · 42-289-31043 · DISTRICT 5

Sullivan Harold #1

N

Leon County · Alabama Ferry (Glenrose D West) field  · Vertical

Sullivan Harold #1 (API 42-289-31043) is a well in Leon County operated by Wisenbaker Production Company, completed January 26, 1990.

The RRC has issued one drilling permit (amended once), issued December 1, 1989, permitted to 9,075 ft.

Completion filings report 6 formation tops, including Subclarksville, Subclarkville, Woodbine, Buda.

Its 4 leases have reported 23.9K barrels of oil and 190K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Wisenbaker Production Company

Tyler, TX · P-5 Y, filed Sep 9, 2011 · 145 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWisenbaker Production Company
Production reportsJay Management Company, LLCthrough Apr 2026
Latest permitWisenbaker Prod. Co.Dec 1, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,075
total depth, ft
2
permits on file
Dec 1, 1989
last permit issued
Jan 26, 1990
completed
23.9K
cumulative oil, bbl
190K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 26, 1990
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sullivan, Harold G-5-301452Alabama Ferry (Glenrose D, West)Jay Management Company, LLC10296Nov 2025 – Jul 2026
Sullivan, Harold O-5-3633Alabama Ferry (Glenrose D, West)Jay Management Company, LLC123.9K79.2KSep 1998 – Jul 2026
Sullivan, Harold G-5-134503Alabama Ferry (Glenrose D, West)Bledsoe Petro Corporation10110KJan 1993 – Dec 1998
— O-5-3338——000—

Oil, barrels lease total

Last 12 months 0 · prior 12 10(-100%)

0204060202420252026

Gas, mcf lease total

Last 12 months 612 · prior 12 550(+11%)

0204060202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Wisenbaker Production CompanyJan 1993 → Jan 1994
  2. 2Bledsoe Petro CorporationFeb 1994 → Jul 2000
  3. 3Phoenix Hydrocarbons OperatingAug 2000 → Sep 2008
  4. 4Jay Management Company, LLCOct 2008 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
366882-98DrillWisenbaker Prod. Co.Feb 20, 1990Dec 1, 1989—9,075
366882-99DrillWisenbaker Prod. Co.Nov 27, 1989Dec 1, 1989—9,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-134503————
—— G-5-301452————
—— O-5-3338————
—— O-5-3633————

Formation tops

As filed on W-2/G-1. Subsea from 297 ft elevation.Download CSV →

FormationMD ftSubsea
Subclarksville6,453-6,156
Subclarkville6,453-6,156
Woodbine6,682-6,385
Buda7,315-7,018
Paluxy8,370-8,073
Glen Rose8,558-8,261

Perforations

Perforated and open-hole intervals.

FromToType
8,9808,990Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
164024—
8.6253,14211740 S
4.59,0757.875570 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 28, 2026Apr 28, 2026Yes
00Sep 24, 1998Sep 10, 1998—
00Jun 12, 1990Mar 26, 1990—
00Jun 5, 1990——
00Apr 27, 1990Feb 16, 1990Yes
00Apr 3, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28931043, documented in the API reference.