WELL · 42-289-31064 · DISTRICT 5
Sullivan A #2
Leon County · Eileen Sullivan (Glen Rose) field · Vertical
Sullivan A #2 (API 42-289-31064) is a plugged well in Leon County, plugged July 21, 2003, last operated by Brandon Energy Inc..
The RRC has issued one drilling permit (amended once), issued May 21, 1990, permitted to 9,000 ft.
It was permitted by Machin, Art & Associates, Inc. and has since transferred to Brandon Energy Inc. on the wellbore schedule.
Completion filings report 5 formation tops, including Austin Chalk, Buda, Edwards, Paluxy.
Operator of record
Permitted by Machin, Art & Associates, Inc.; the EWA schedule now lists a different operator.
Bullard, TX · P-5 Y, filed Feb 3, 2017 · 7 permits on file · (903) 597-7667
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Brandon Energy Inc. |
| Production reports | Machin & Associates, Inc.through Nov 1993 |
| Latest permit | Machin, Art & Associates, Inc.May 21, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,000
- total depth, ft
- 2
- permits on file
- May 21, 1990
- last permit issued
- Aug 20, 1990
- completed
- 0
- cumulative oil, bbl
- 35.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2005
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 20, 1990
- Shut in
- —
- Plugged
- Jul 21, 2003
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sullivan "A" G-5-135868 | Eileen Sullivan (Glen Rose) | Brandon Energy, Inc. | 1 | 0 | 35.8K | Jan 1993 – Sep 2005 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Machin & Associates, Inc.Jan 1993 → Nov 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 373231-98 | Drill | Machin, Art & Associates, Inc. | Jun 4, 1990 | May 21, 1990 | Jul 7, 1990 | 9,000 |
| 373231-99 | Drill | Machin, Art & Associates, Inc. | May 11, 1990 | May 21, 1990 | — | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-5-135868 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 267 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin ChalkAUSTIN CHALK (BASE) | 6,043 | -5,776 |
| Buda | 6,911 | -6,644 |
| Edwards | 7,495 | -7,228 |
| Paluxy | 7,902 | -7,635 |
| Glen Rose | 8,188 | -7,921 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,501 | 8,507 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,845 | 11 | 961 S |
| 4.5 | 8,560 | 7.875 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 15, 1990 | Sep 4, 1990 | Yes |
| 00 | Oct 22, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-289-31064 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-289-31064 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28931064, documented in the API reference.