WELL · 42-289-31144 · DISTRICT 5
Baker #3
Leon County · Centerville (Glen Rose G ) field · Vertical
Baker #3 (API 42-289-31144) is a plugged well in Leon County, plugged December 3, 1992, last operated by Machin & Associates Inc..
The RRC has issued one drilling permit, issued July 23, 1991, permitted to 9,100 ft.
It was permitted by Machin, Art & Associates, Inc. and has since transferred to Machin & Associates Inc. on the wellbore schedule.
Completion filings report 2 formation tops, including Austin Chalk, Glen Rose.
Operator of record
Permitted by Machin, Art & Associates, Inc.; the EWA schedule now lists a different operator.
Longview, TX · P-5 Y, filed Dec 4, 2025 · 78 permits on file · (903) 738-5181
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Machin & Associates Inc. |
| Production reports | none |
| Latest permit | Machin, Art & Associates, Inc.Jul 23, 1991 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,100
- total depth, ft
- 1
- permits on file
- Jul 23, 1991
- last permit issued
- Apr 11, 1992
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 1993
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 11, 1992
- Shut in
- —
- Plugged
- Dec 3, 1992
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Baker O-5-3407 | Centerville (Glen Rose "G") | Machin & Associates, Inc. | 1 | 0 | 0 | Jan 1993 – Apr 1993 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 390189-99 | Drill | Machin, Art & Associates, Inc. | Jul 23, 1991 | Jul 23, 1991 | Aug 18, 1991 | 9,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-5-3407 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 358 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin ChalkBASE AUSTIN CHALK | 6,124 | -5,766 |
| Glen RoseGLEN ROSE "A" | 8,276 | -7,918 |
| Glen RoseGLEN ROSE A | 8,276 | -7,918 |
| Glen RoseGLEN ROSE "B" | 8,331 | -7,973 |
| Glen RoseGLEN ROSE B | 8,331 | -7,973 |
| Glen RoseGLEN ROSE "C" | 8,437 | -8,079 |
| Glen RoseGLEN ROSE C | 8,437 | -8,079 |
| Glen RoseGLEN ROSE "D" | 8,579 | -8,221 |
| Glen RoseGLEN ROSE D | 8,579 | -8,221 |
| Glen RoseGLEN ROSE "G" | 8,940 | -8,582 |
| Glen RoseGLEN ROSE G | 8,940 | -8,582 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,579 | 8,586 | Perforated |
| 8,580 | 8,587 | Perforated |
| 8,941 | 8,944 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,950 | 11 | 785 S |
| 4.5 | 9,080 | 7.875 | 600 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 6, 1992 | Apr 20, 1992 | — |
| 00 | Apr 7, 1992 | Jan 24, 1992 | Yes |
| 00 | Mar 11, 1992 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-289-31144 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-289-31144 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28931144, documented in the API reference.