WELL · 42-289-31230 · DISTRICT 5

Blazek #4

N

Leon County  · Directional

Blazek #4 (API 42-289-31230) is a permitted well in Leon County filed by Xto Energy Inc.; no completion report is on file yet.

The RRC has issued 3 drilling permits (amended 5 times) between 1995 and 2014, permitted to 17,000 ft.

Completion filings report 5 formation tops, including Pettit, Travis Peak, Cvs, Knowles.

Operator of record

XTO Energy Inc.

Spring, TX · P-5 Y, filed Feb 4, 2026 · 16,153 permits on file · (832) 625-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsXTO Energy Inc.through Jun 2019
Latest permitXTO Energy Inc.Mar 25, 2014
17,000
total depth, ft
8
permits on file
Mar 25, 2014
last permit issued
—
completed
0
cumulative oil, bbl
1.11M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Blazek G-5-174884Bear Grass (Cotton Valley Cons)Hilcorp Energy Company10838KSep 1999 – Jul 2026
Blazek G-5-164954Bear Grass (Cotton Valley Lime)Sonat Exploration Company -Tyler10269KJul 1997 – Sep 1999

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sonat Exploration Company -TylerJul 1997 → Dec 1999
  2. 2EL Paso Production CompanyJan 2000 → Mar 2002
  3. 3Hunt Petroleum CorporationApr 2002 → Nov 2008
  4. 4XTO Energy Inc.Dec 2008 → Jun 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
780309-99RecompletionXTO Energy Inc.Feb 20, 2014Mar 25, 2014—15,073
486284-99RecompletionSonat Exploration Company -TylerJul 30, 1999Aug 24, 1999Sep 5, 199917,000
441331-94DrillSonat Exploration Company -TylerAug 15, 1997Oct 27, 1995Sep 16, 199717,000
441331-95DrillSonat Exploration Company -TylerMay 13, 1997Oct 27, 1995—17,000
441331-96DrillSonat Exploration Company -TylerDec 6, 1996Oct 27, 1995—17,000
441331-97DrillSonat Exploration Company -TylerAug 27, 1996Oct 27, 1995—15,400
441331-98DrillSonat Exploration Company -TylerJan 25, 1996Oct 27, 1995—15,400
441331-99DrillSonat Exploration Company -TylerOct 27, 1995Oct 27, 1995—15,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-164954————
—— G-5-174884————

Formation tops

As filed on W-2/G-1. Subsea from 499 ft elevation.Download CSV →

FormationMD ftSubsea
Pettit9,115-8,616
Travis Peak9,505-9,006
CVS11,613-11,114
Knowles12,300-11,801
Bossier13,330-12,831

Perforations

Perforated and open-hole intervals.

FromToType
12,32413,570Perforated
13,46813,472Perforated
13,56613,570Perforated
14,76514,770Perforated
14,85014,855Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.755,78614.758,000 S
7.62513,9999.8752,260 S
3.515,0736.25630 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 12, 2015Jan 16, 2015—
00Dec 16, 1999Oct 7, 1999Yes
00Dec 3, 1999——
00Nov 13, 1997Aug 20, 1997Yes
00Oct 30, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28931230, documented in the API reference.