WELL · 42-289-31246 · DISTRICT 5
Harcrow #1
Leon County · Directional · Sidetrack
Harcrow #1 (API 42-289-31246) is a plugged well in Leon County, plugged February 4, 1997, last operated by Rippy Oil Company.
The RRC has issued 2 drilling permits (amended twice) between 1996 and 1998, permitted to 17,000 ft.
Completion filings report 3 formation tops, including Rodessa, Pettit, Travis Peak.
Operator of record
Tyler, TX · P-5 Y, filed Jun 4, 2026 · 60 permits on file · (903) 570-9344
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Atlas Operating LLCthrough Mar 2026 |
| Latest permit | Rippy Oil CompanyJul 27, 1998 |
- 17,000
- total depth, ft
- 4
- permits on file
- Jul 27, 1998
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 1.28M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1998 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Feb 4, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Harcrow, S G-5-170847 | Jewett (Travis Peak) | Atlas Operating LLC | 1 | 0 | 1.28M | Aug 1998 – Jul 2026 |
Gas, mcf lease total
Last 12 months 28,058 · prior 12 30,778(-9%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Rippy Oil CompanySep 1998 → Jul 2003
- 2BRG Petroleum CorporationAug 2003 → Feb 2005
- 3Chesapeake Operating, Inc.Mar 2005 → Oct 2014
- 4Chesapeake Operating, L.L.C.Nov 2014 → Dec 2014
- 5SND Operating, L.L.C.Jan 2015 → May 2015
- 6BRG Lone Star Ltd.Jul 2015 → Feb 2026
- 7Atlas Operating LLCMar 2026 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 478268-98 | Reenter | Rippy Oil Company | Oct 16, 1998 | Jul 27, 1998 | Aug 3, 1998 | 10,000 |
| 478268-99 | Reenter | Rippy Oil Company | Jul 27, 1998 | Jul 27, 1998 | — | 10,000 |
| 452227-98 | Drill · sidetrack | Apache Corporation | Jan 7, 1997 | Sep 3, 1996 | — | 16,000 |
| 452227-99 | Drill | American Cometra, Inc. | Sep 3, 1996 | Sep 3, 1996 | Sep 7, 1996 | 17,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-5-170847 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 392 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rodessa | 8,450 | -8,058 |
| Pettit | 9,137 | -8,745 |
| Travis Peak | 9,510 | -9,118 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,647 | 9,657 | Perforated |
| 9,761 | 9,771 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,512 | 17.5 | 1,085 S |
| 9.625 | 10,363 | 12.25 | 1,500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 29, 1998 | Sep 21, 1998 | Yes |
| 00 | Dec 2, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-289-31246 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-289-31246 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.