WELL · 42-289-31373 · DISTRICT 5
Walker #3
Leon County · Bear Grass (Travis Peak) field · Vertical
Walker #3 (API 42-289-31373) is a plugged well in Leon County, plugged April 23, 2015, last operated by Wildco Resources Inc..
The RRC has issued 2 drilling permits between 2003 and 2005, permitted to 11,000 ft.
Completion filings report 6 formation tops, including Bac, Commanche Lm, Paluxy, Rodessa.
Operator of record
Tyler, TX · P-5 Y, filed Dec 15, 2017 · 12 permits on file · (903) 520-7391
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Wildco Resources Inc. |
| Production reports | Wildco Resources, Inc.through Apr 2015 |
| Latest permit | Wildco Resources, Inc.May 23, 2005 |
- 11,000
- total depth, ft
- 2
- permits on file
- May 23, 2005
- last permit issued
- Oct 3, 2003
- completed
- 0
- cumulative oil, bbl
- 431K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2003 THROUGH Apr 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 3, 2003
- Shut in
- —
- Plugged
- Apr 23, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Walker G-5-200852 | Bear Grass (Travis Peak) | Wildco Resources, Inc. | 1 | 0 | 73.9K | Oct 2003 – Apr 2015 |
| Walker Gas Unit 1 G-5-209652 | Bear Grass (Pettit) | Wildco Resources, Inc. | 1 | 0 | 358K | Jan 2005 – Apr 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1West Mountain Operating Co, Inc.Oct 2003 → Feb 2004
- 2Wildco Resources, Inc.Mar 2004 → Apr 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 601090-99 | Recompletion | Wildco Resources, Inc. | May 23, 2005 | May 23, 2005 | — | 9,350 |
| 530980-99 | Drill | Wildco Resources, Inc. | Apr 21, 2003 | Apr 21, 2003 | Jul 17, 2003 | 11,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-5-200852 | — | — | — | — |
| — | — G-5-209652 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 471 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Bac | 4,890 | -4,419 |
| Commanche LM | 5,680 | -5,209 |
| Paluxy | 6,750 | -6,279 |
| Rodessa | 8,300 | -7,829 |
| Pettit | 9,000 | -8,529 |
| Travis Peak | 9,430 | -8,959 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,164 | 9,168 | Perforated |
| 9,448 | 9,456 | Perforated |
| 9,458 | 9,470 | Perforated |
| 9,482 | 9,484 | Perforated |
| 9,521 | 9,523 | Perforated |
| 9,535 | 9,542 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,701 | 11 | 395 S |
| 4.5 | 9,771 | 7.875 | 675 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 22, 2005 | Apr 14, 2005 | — |
| 00 | Jul 26, 2005 | — | — |
| 00 | Jun 8, 2004 | Mar 22, 2004 | Yes |
| 00 | May 7, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-289-31373 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-289-31373 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28931373, documented in the API reference.