WELL · 42-289-31550 · DISTRICT 5
West #1
Leon County · Red Oak (Dexter) field · Producing · Vertical
West #1 (API 42-289-31550) is a well in Leon County operated by Barrow-Shaver Resources CO., completed December 14, 2006 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued January 12, 2006, permitted to 7,500 ft.
Completion filings report 6 formation tops, including T. U. Cret, T. Nay, Pecan Gap, Austin Chalk.
Its lease has reported 60.9K barrels of oil and 50.6K mcf of gas since December 2006, last reporting in July 2026.
Operator of record
Tyler, TX · P-5 Y, filed Feb 4, 2026 · 201 permits on file · (903) 593-5221
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Barrow-Shaver Resources Co. |
| Production reports | Barrow-Shaver Resources Co.through Apr 2026 |
| Latest permit | Barrow-Shaver Resources Co.Jan 12, 2006 |
- 7,500
- total depth, ft
- 2
- permits on file
- Jan 12, 2006
- last permit issued
- Dec 14, 2006
- completed
- 60.9K
- cumulative oil, bbl
- 50.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2006 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Dec 14, 2006
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| West O-5-3843 | Red Oak (Dexter) | Barrow-Shaver Resources Co. | 1 | 60.9K | 50.6K | Dec 2006 – Jul 2026 |
Oil, barrels lease total
Last 12 months 296 · prior 12 183(+62%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Barrow-Shaver Resources Co.Dec 2006 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 612241-98 | Drill | Barrow-Shaver Resources Co. | Aug 29, 2006 | Jan 12, 2006 | Nov 23, 2006 | 7,000 |
| 612241-99 | Drill | SDG Operating Company, Inc | Jan 11, 2006 | Jan 12, 2006 | — | 7,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-5-3843 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 339 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| T. U. Cret | 3,030 | -2,691 |
| T. Nay | 4,170 | -3,831 |
| Pecan Gap | 4,903 | -4,564 |
| Austin ChalkBASE AUSTIN | 5,660 | -5,321 |
| Woodbine | 6,100 | -5,761 |
| Buda | 6,640 | -6,301 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,532 | 6,540 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 825 | 11 | 337 S |
| 5.5 | 6,750 | 7.875 | 296 S |
| 5.5 | — | 7.875 | 461 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 2, 2007 | Mar 14, 2007 | Yes |
| 00 | Jul 12, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-289-31550 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-289-31550 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28931550, documented in the API reference.