WELL · 42-289-31884 · DISTRICT 6
Lipsey #1
Leon County · Navarro Crossing (Woodbine) field · NO Production · Vertical
Lipsey #1 (API 42-289-31884) is a well in Leon County operated by Quantum Oil & Gas Corporation, completed August 30, 2010 and listed as no production on the RRC schedule.
The RRC has issued one drilling permit, issued August 5, 2010, permitted to 7,000 ft.
It was permitted by Brooks Petroleum Company and has since transferred to Quantum Oil & Gas Corporation on the wellbore schedule.
Completion filings report 3 formation tops, including Pecan Gap, Austin Chalk, Woodbine.
Its lease has reported 52.7K barrels of oil since August 2010, last reporting in July 2026.
Operator of record
Permitted by Brooks Petroleum Company; the EWA schedule now lists a different operator.
Oklahoma City, OK · P-5 Y, filed Dec 4, 2025 · (405) 840-9280
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Quantum Oil & Gas Corporation |
| Production reports | Quantum Oil & Gas Corporationthrough Mar 2021 |
| Latest permit | Brooks Petroleum CompanyAug 5, 2010 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,000
- total depth, ft
- 1
- permits on file
- Aug 5, 2010
- last permit issued
- Aug 30, 2010
- completed
- 52.7K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2010 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 30, 2010
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Lipsey O-6-15005 | Navarro Crossing (Woodbine) | Quantum Oil & Gas Corporation | 1 | 52.7K | 0 | Aug 2010 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Brooks Petroleum CompanyOct 2010 → Sep 2015
- 2Quantum Oil & Gas CorporationApr 2016 → Mar 2021
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 700213-99 | Drill | Brooks Petroleum Company | Aug 4, 2010 | Aug 5, 2010 | Aug 12, 2010 | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-15005 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 195 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pecan Gap | 4,160 | -3,965 |
| Austin Chalk | 5,468 | -5,273 |
| Woodbine | 5,826 | -5,631 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,801 | 5,812 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 797 | 11 | 238 S |
| 5.5 | 6,420 | 7.875 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 14, 2011 | Feb 1, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-289-31884 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-289-31884 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28931884, documented in the API reference.