WELL · 42-289-32019 · DISTRICT 5

AF1U Unit #131

Y

Leon County · Alabama Ferry (Glenrose D West) field · NO Production  · Vertical

Af1u Unit #131 (API 42-289-32019) is a well in Leon County operated by Roy Jackson Energy Operating LL, completed December 20, 2012 and listed as no production on the RRC schedule.

The RRC has issued one drilling permit, issued September 14, 2012, permitted to 10,400 ft.

It was permitted by Treadstone Energy Partners, LLC and has since transferred to Roy Jackson Energy Operating LL on the wellbore schedule.

Completion filings report one formation top, including Glen Rose.

Its lease has reported 80.9K barrels of oil and 312K mcf of gas since April 2008, last reporting in July 2026. The lease carries 23 wells, so these are lease totals, not this well alone.

Operator of record

Roy Jackson Energy Operating LL

Permitted by Treadstone Energy Partners, LLC; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Jul 4, 2026 · (512) 791-4267

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRoy Jackson Energy Operating LL
Production reportsRoy Jackson Energy Operating, LLthrough Dec 2025
Latest permitTreadstone Energy Partners, LLCSep 14, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,400
total depth, ft
1
permits on file
Sep 14, 2012
last permit issued
Dec 20, 2012
completed
80.9K
cumulative oil, bbl
312K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 20, 2012
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 23 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
AF1U Unit O-5-3869Alabama Ferry (Glenrose D, West)Roy Jackson Energy Operating, LL2380.9K312KApr 2008 – Jul 2026

Gas, mcf lease total

Last 12 months 610 · prior 12 626(-3%)

01K2K202420252026

Oil, barrels lease total

Last 12 months 0 · prior 12 0

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bowles Energy, Inc.Apr 2008 → Nov 2011
  2. 2Treadstone Energy Partners, LLCDec 2011 → Jun 2016
  3. 3JTL Operating Co., IncJul 2016 → Feb 2018
  4. 4Oro Resources, LLCMar 2018 → Apr 2023
  5. 5Roy Jackson Energy Operating, LLMay 2023 → Jul 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
746311-99DrillTreadstone Energy Partners, LLCAug 10, 2012Sep 14, 2012Nov 9, 201210,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-5-3869————

Formation tops

As filed on W-2/G-1. Subsea from 223 ft elevation.Download CSV →

FormationMD ftSubsea
Glen RoseGLENROSE D9,971-9,748

Perforations

Perforated and open-hole intervals.

FromToType
9,97110,038Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,33312.25965 S
5.510,4958.75540 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 24, 2013Jan 16, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28932019, documented in the API reference.