WELL · 42-291-31642 · DISTRICT 3
Daniel Bill #1
Liberty County · Rich Ranch N. (Y6D-Oil) field · Vertical
Daniel Bill #1 (API 42-291-31642) is a plugged well in Liberty County, plugged March 25, 1993, last operated by Energy Development Corp..
The RRC has issued one drilling permit, issued July 5, 1983, permitted to 13,500 ft.
It was permitted by O.I.L. Energy, Inc. and has since transferred to Energy Development Corp. on the wellbore schedule.
Completion filings report 4 formation tops, including Miocene (undifferentiated), Frio, 2nd Zichs Duig, Yegua.
Operator of record
Permitted by O.I.L. Energy, Inc.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Jul 8, 2005 · 135 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Energy Development Corp. |
| Production reports | none |
| Latest permit | O.I.L. Energy, Inc.Jul 5, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 13,500
- total depth, ft
- 1
- permits on file
- Jul 5, 1983
- last permit issued
- Sep 20, 1983
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 1993
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 20, 1983
- Shut in
- —
- Plugged
- Mar 25, 1993
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Daniel, Bill O-3-18517 | Rich Ranch, N. (Y6D-Oil) | Energy Development Corp. | 2 | 0 | 0 | Jan 1993 – May 1993 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 200480-99 | Drill | O.I.L. Energy, Inc. | Jul 5, 1983 | Jul 5, 1983 | Jul 22, 1983 | 13,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-18517 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 73 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE | 5,210 | -5,137 |
| FrioTOP FRIO | 5,500 | -5,427 |
| 2ND Zichs Duig | 7,810 | -7,737 |
| YeguaTOP YEGUA | 9,900 | -9,827 |
| YeguaTOP YEGUA 6-3 | 10,460 | -10,387 |
| YeguaTOP YEGUA 6-D | 10,960 | -10,887 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,962 | 10,969 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,000 | 14.75 | 1,275 S |
| 7.625 | 10,050 | 9.875 | 475 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 21, 1986 | Apr 22, 1986 | — |
| 00 | May 7, 1986 | — | — |
| 00 | Feb 7, 1984 | Dec 13, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-291-31642 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-291-31642 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29131642, documented in the API reference.