WELL · 42-291-32042 · DISTRICT 3

Robinson, E. G. et AL #2SW

N

Liberty County  · Vertical

Robinson, E. G. ET AL #2SW (API 42-291-32042) is a former disposal or injection well in Liberty County, last operated by Taylor-Mcilhenny Oper. CO., Inc.; its UIC permit is no longer active.

The RRC has issued one drilling permit, issued August 12, 1988, permitted to 2,500 ft.

Operator of record

Taylor-McIlhenny Oper. Co., Inc.

Lewisville, TX · P-5 Y, filed Jun 2, 1995 · 3 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitTaylor-McIlhenny Oper. Co., Inc.Aug 12, 1988
2,500
total depth, ft
1
permits on file
Aug 12, 1988
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
350113-99DrillTaylor-McIlhenny Oper. Co., Inc.Aug 12, 1988Aug 12, 1988—2,500

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Nov 1995
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000067889W-14 DisposalNot activated6001,0002,270–2,410

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119941995

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29132042, documented in the API reference.