WELL · 42-291-32292 · DISTRICT 3
Kelly #1D
Liberty County · Lost Ranch (LY-4 Yegua) field · Vertical
Kelly #1D (API 42-291-32292) is a plugged well in Liberty County, plugged June 7, 2000, last operated by Atp Oil & Gas Corporation.
The RRC has issued one drilling permit (amended twice), issued August 4, 1997, permitted to 3,500 ft.
Its lease has reported 21.3K barrels of oil and 108K mcf of gas since June 1997, last reporting in August 2003. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Houston, TX · P-5 Y, filed Jul 6, 2007 · 5 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Atp Oil & Gas Corporation |
| Production reports | Atp Oil & Gas Corporationthrough Apr 1999 |
| Latest permit | Atp Oil & Gas CorporationAug 4, 1997 |
- 3,500
- total depth, ft
- 3
- permits on file
- Aug 4, 1997
- last permit issued
- Feb 14, 1999
- completed
- 21.3K
- cumulative oil, bbl
- 108K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 1997 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 14, 1999
- Shut in
- —
- Plugged
- Jun 7, 2000
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kelly O-3-23413 | Lost Ranch (LY-4 Yegua) | Atp Oil & Gas Corporation | 2 | 21.3K | 108K | Jun 1997 – Aug 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Atp Oil & Gas CorporationJun 1997 → Apr 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 465769-97 | Drill | Atp Oil & Gas Corporation | Jul 24, 1998 | Aug 4, 1997 | Aug 27, 1997 | 3,500 |
| 465769-98 | Drill | Atp Oil & Gas Corporation | Aug 26, 1997 | Aug 4, 1997 | — | 3,000 |
| 465769-99 | Drill | Atp Oil & Gas Corporation | Aug 4, 1997 | Aug 4, 1997 | — | 2,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-23413 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,146 | 3,176 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 900 | 12.25 | 335 S |
| 7 | 3,200 | 8.75 | 490 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 8, 1999 | Feb 14, 1999 | — |
| 00 | Mar 4, 1999 | Jan 23, 1998 | — |
| 00 | Feb 18, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-291-32292 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-291-32292 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 193K
- bbl, all reported
- Nov 1999
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000086877 | W-14 Disposal | Plugged Jul 14, 2000 | 1,500 | 1,150 | 2,650–3,200 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 192,985(-100%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29132292, documented in the API reference.