WELL · 42-291-32667 · DISTRICT 3
Galloway Gas Unit 2 #1
Liberty County · Moss Bluff North (Yegua EY-4) field · Directional
Galloway Gas Unit 2 #1 (API 42-291-32667) is a plugged well in Liberty County, plugged February 17, 2012, last operated by Carrizo Oil & Gas Inc..
The RRC has issued 2 drilling permits between 2006 and 2007, permitted to 15,500 ft.
Completion filings report 5 formation tops, including Het, Frio, Vicksburg, Moody'S Branch.
Operator of record
Houston, TX · P-5 Inactive, filed Jan 7, 2021 · 1,194 permits on file · (713) 328-1000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Carrizo Oil & Gas Inc. |
| Production reports | Carrizo Oil & Gas, Inc.through Apr 2011 |
| Latest permit | Carrizo Oil & Gas, Inc.Sep 7, 2007 |
- 15,500
- total depth, ft
- 2
- permits on file
- Sep 7, 2007
- last permit issued
- Nov 3, 2007
- completed
- 0
- cumulative oil, bbl
- 2.57M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2006 THROUGH Feb 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 3, 2007
- Shut in
- —
- Plugged
- Feb 17, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Galloway Gas Unit 2 G-3-233246 | Moss Bluff, North (Yegua EY-4) | Carrizo Oil & Gas, Inc. | 1 | 0 | 1.83M | Nov 2007 – Feb 2012 |
| Galloway Gas Unit 2 G-3-223614 | Moss Bluff, North | Carrizo Oil & Gas, Inc. | 1 | 0 | 741K | Oct 2006 – Nov 2007 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Carrizo Oil & Gas, Inc.Oct 2006 → Apr 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 645630-99 | Recompletion | Carrizo Oil & Gas, Inc. | Sep 6, 2007 | Sep 7, 2007 | Sep 17, 2007 | 15,500 |
| 620273-99 | Drill | Carrizo Oil & Gas, Inc. | Jun 1, 2006 | Jun 1, 2006 | Jun 21, 2006 | 15,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-223614 | — | — | — | — |
| — | — G-3-233246 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 68 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 13,554 | 13,598 | Perforated |
| 13,620 | 13,651 | Perforated |
| 13,784 | 13,790 | Perforated |
| 14,480 | 14,487 | Perforated |
| 14,491 | 14,494 | Perforated |
| 14,504 | 14,518 | Perforated |
| 14,539 | 14,554 | Perforated |
| 14,559 | 14,570 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 3,031 | 17.5 | 2,825 S |
| 9.625 | 10,689 | 12.25 | 465 S |
| 4.5 | 14,748 | 6.5 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 24, 2008 | Dec 3, 2007 | Yes |
| 00 | Feb 25, 2008 | — | — |
| 00 | Apr 30, 2007 | Dec 7, 2006 | Yes |
| 00 | Jan 5, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-291-32667 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-291-32667 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29132667, documented in the API reference.