WELL · 42-293-30089 · DISTRICT 5

Livingston Estate #1

N

Limestone County · Little Buddy (Cotton Valley Lime field  · Vertical

Livingston Estate #1 (API 42-293-30089) is a well in Limestone County operated by Z/F Little Buddy L.P., completed February 3, 1975.

The RRC has issued one drilling permit, issued August 11, 1999, permitted to 13,000 ft.

Completion filings report 8 formation tops, including Nacotoch, Austin Chalk, Woodbine, Lower Cretaceous.

No lease production has been reported under this well’s leases.

Operator of record

Z/F Little Buddy L.P.

Tyler, TX · P-5 Y, filed Jul 5, 2002 · 12 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleZ/F Little Buddy L.P.
Production reportsCraton Operating LLCthrough Apr 2026
Latest permitZ/F Little Buddy, L.P.Aug 11, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,000
total depth, ft
1
permits on file
Aug 11, 1999
last permit issued
Feb 3, 1975
completed
0
cumulative oil, bbl
1.49M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 3, 1975
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Livingston Estate Gas Unit G-5-174387Little Buddy (Cotton Valley Sd.)Craton Operating LLC101.44MJul 1999 – Jul 2026
Livingston, Estate G-5-62246Little Buddy (Cotton Valley LimeZ/F Little Buddy, L.P.1057KJan 1993 – Jul 1999

Gas, mcf lease total

Last 12 months 1,200 · prior 12 979(+23%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Thor Operating CompanyJan 1993 → Dec 1995
  2. 2Zapata-Fender, L. L. C.Jan 1996 → Sep 1998
  3. 3Z/F Little Buddy, L.P.Oct 1998 → Jul 2000
  4. 4Samson Lone Star LPAug 2000 → Jun 2007
  5. 5Samson Lone Star, LLCJul 2007 → Nov 2009
  6. 6Ironwood Oil & Gas LLCDec 2009 → Jun 2014
  7. 7Cl&f Operating LLCJul 2014 → May 2020
  8. 8Craton Operating LLCJun 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
486568-99RecompletionZ/F Little Buddy, L.P.Aug 11, 1999Aug 11, 1999Jun 26, 199913,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-62246————
—— G-5-174387————

Formation tops

As filed on W-2/G-1. Subsea from 500 ft elevation.Download CSV →

FormationMD ftSubsea
Nacotoch1,510-1,010
Austin Chalk3,285-2,785
Woodbine4,070-3,570
Lower Cretaceous4,410-3,910
Pettit7,180-6,680
Travis Peak7,370-6,870
Cotton ValleyCOTTON VALLEY LIME10,764-10,264
Smackover11,800-11,300

Perforations

Perforated and open-hole intervals.

FromToType
9,3419,364Perforated
10,76410,864Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37539717.5—
13.375397——
9.6254,47512.25—
9.6254,475——
511,2007.875—
511,200——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 20, 1999Aug 17, 1999Yes
00Oct 11, 1999——
00Jan 12, 1984Feb 13, 1975—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29330089, documented in the API reference.