WELL · 42-293-30401 · DISTRICT 5

Tidwell #1

Plugged

Limestone County  · Vertical

Tidwell #1 (API 42-293-30401) is a plugged well in Limestone County, plugged January 28, 2002, last operated by Tahoe Exploration Inc..

The RRC has issued 2 drilling permits between 1977 and 2001, permitted to 3,200 ft.

Operator of record

Tahoe Exploration Inc.

Abilene, TX · P-5 Y, filed Nov 6, 2015 · 62 permits on file · (325) 201-5965

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitTahoe Exploration Inc.Oct 31, 2001
3,200
total depth, ft
2
permits on file
Oct 31, 2001
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jan 28, 2002

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
514800-99ReenterTahoe Exploration Inc.Oct 26, 2001Oct 31, 2001Jan 8, 20023,048
14188-99DrillCondor Energy CorporationDec 16, 1977Dec 16, 1977Dec 22, 19773,200

Perforations

Perforated and open-hole intervals.

FromToType
2,9642,966Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62520712.25100 S
2.8753,0486.75120 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jul 19, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29330401, documented in the API reference.