WELL · 42-293-30686 · DISTRICT 5

Archibald et AL #1

Plugged

Limestone County · Box Church (Cotton Valley Lime) field  · Vertical

Archibald ET AL #1 (API 42-293-30686) is a plugged well in Limestone County, plugged October 2, 2012, last operated by Comstock Oil & Gas LP.

The RRC has issued 2 drilling permits between 1983 and 2004, permitted to 10,500 ft.

It was permitted by Comstock Oil & Gas, Inc. and has since transferred to Comstock Oil & Gas LP on the wellbore schedule.

Completion filings report 8 formation tops, including Austin Chalk, Base Mass. Anhy, BMA, James Lime.

Operator of record

Comstock Oil & Gas LP

Permitted by Comstock Oil & Gas, Inc.; the EWA schedule now lists a different operator.

Frisco, TX · P-5 Y, filed Aug 7, 2020 · 799 permits on file · (800) 929-4884

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleComstock Oil & Gas LP
Production reportsComstock Oil & Gas, LPthrough Aug 2011
Latest permitComstock Oil & Gas, Inc.Nov 8, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,500
total depth, ft
2
permits on file
Nov 8, 2004
last permit issued
Feb 8, 1984
completed
0
cumulative oil, bbl
412K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2013

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 8, 1984
Shut in
—
Plugged
Oct 2, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Archibald et AL G-5-205510Box Church (Cotton Valley)Comstock Oil & Gas, LP10108KSep 2004 – Jan 2013
Archibald et AL G-5-109292Box Church (Cotton Valley Lime)Comstock Oil & Gas, LP10304KJan 1993 – Feb 2005

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Comstock Oil & Gas, Inc.Jan 1993 → Aug 2004
  2. 2Comstock Oil & Gas, LPSep 2004 → Aug 2011

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
553028-99RecompletionComstock Oil & Gas, Inc.Nov 1, 2004Nov 8, 2004—9,730
204868-99DrillGoodrich Oil CompanyAug 10, 1983Aug 10, 1983—10,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-109292————
—— G-5-205510————

Formation tops

As filed on W-2/G-1. Subsea from 442 ft elevation.Download CSV →

FormationMD ftSubsea
Austin ChalkBASE AUSTIN CHALK3,400-2,958
Base Mass. Anhy6,078-5,636
BMA6,080-5,638
James LimeJAMES6,521-6,079
PettitPETTET6,610-6,168
Sligo6,622-6,180
Travis Peak6,808-6,366
Travis Peak6,810-6,368
Cotton Valley8,700-8,258
Cotton ValleyCOTTON VALLEY BROKEN8,712-8,270
Cotton ValleyCOTTON VALLEY LIME10,202-9,760

Perforations

Perforated and open-hole intervals.

FromToType
8,9929,007Perforated
9,0829,090Perforated
9,1029,120Perforated
9,2069,222Perforated
9,2369,331Perforated
10,24610,307Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,56012.25516 S
5.510,4418.751,100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 4, 2005Nov 1, 2004Yes
00Jan 24, 2005——
00Mar 19, 1984Mar 1, 1984—
00Mar 14, 1984Mar 1, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29330686, documented in the API reference.