WELL · 42-293-30817 · DISTRICT 5

Smith W. E. & Wife #6

Y

Limestone County · Wortham field · Shut IN  · Vertical

Smith W. E. & Wife #6 (API 42-293-30817) is a well in Limestone County operated by Haynie Energy Services LLC, completed June 29, 1990 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued November 5, 1985, permitted to 3,200 ft.

It was permitted by Miller, B. H. Oil CO. and has since transferred to Haynie Energy Services LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Nacatoch, Austin Chalk.

Its lease has reported 28.9K barrels of oil and 177 mcf of gas since January 1993, last reporting in July 2026. The lease carries 6 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Haynie Energy Services LLC

Permitted by Miller, B. H. Oil Co.; the EWA schedule now lists a different operator.

Wortham, TX · P-5 Y, filed Sep 4, 2025 · 2 permits on file · (214) 448-5404

SOURCE · RRC EWA WELLBORE SCHEDULE

3,200
total depth, ft
1
permits on file
Nov 5, 1985
last permit issued
Jun 29, 1990
completed
28.9K
cumulative oil, bbl
177
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 29, 1990
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Smith, W. E. & Wife O-5-1275WorthamHaynie Energy Services LLC628.9K177Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Samis Oil Company, Inc.Jan 1993 → Aug 1994
  2. 2Means Oil Co.Sep 1994 → Oct 2007
  3. 3Miller, B. H. Oil Co.Jan 1997 → Aug 1998
  4. 4Means, Frank L.Oct 1998 → Jan 2001
  5. 5Arrowhead Operating Inc.Nov 2007 → Oct 2008
  6. 6BHB Operating Inc.Nov 2008 → May 2012
  7. 7G.I.F. Operating Company, LLCOct 2009 → Jul 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
289146-99DrillMiller, B. H. Oil Co.Oct 29, 1985Nov 5, 1985Jan 2, 19863,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-5-1275————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Nacatoch1,400
Austin Chalk2,770

Perforations

Perforated and open-hole intervals.

FromToType
2,9982,999Perforated
3,0563,076Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62513612.2570 S
5.53,1537.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 19, 1990Jul 9, 1990—
00Mar 13, 1986Feb 10, 1986Yes
00Mar 11, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
3.19M
bbl, all reported
Nov 2021
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000072950H-1 InjectionActive3,0001,4502,985–3,153

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120202021

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29330817, documented in the API reference.