WELL · 42-293-31008 · DISTRICT 5
Yarbrough #1
Limestone County · Vertical
Yarbrough #1 (API 42-293-31008) is a former disposal or injection well in Limestone County, last operated by Marathon Oil Company; its UIC permit is no longer active.
The RRC has issued 2 drilling permits between 1993 and 2010, permitted to 9,600 ft.
Completion filings report 7 formation tops, including T/Pecan Gap, T/Paluxy, T/Glen Rose, Massive Anhydrite (marker).
Operator of record
Houston, TX · P-5 Y, filed Apr 4, 2026 · 3,707 permits on file · (800) 332-9449
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Sklar & Phillips Oil Co.through Dec 1996 |
| Latest permit | Marathon Oil CompanyOct 26, 2010 |
- 9,600
- total depth, ft
- 2
- permits on file
- Oct 26, 2010
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 769K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Yarbrough G-5-147545 | Oletha (Travis Peak) | Lodestone Operating, Inc. | 1 | 0 | 769K | Aug 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sklar & Phillips Oil Co.Aug 1993 → Dec 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 703391-99 | Recompletion | Marathon Oil Company | Oct 7, 2010 | Oct 26, 2010 | — | 9,600 |
| 411795-99 | Drill | Sklar & Phillips Oil Co. | May 14, 1993 | Jun 8, 1993 | Jun 21, 1993 | 9,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-5-147545 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 408 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| T/Pecan Gap | 3,555 | -3,147 |
| T/Paluxy | 4,600 | -4,192 |
| T/Glen Rose | 5,255 | -4,847 |
| Massive Anhydrite (marker)BASE MASSIVE ANHYDRITE | 6,640 | -6,232 |
| T/Sligo | 7,260 | -6,852 |
| T. Travis Peak | 7,470 | -7,062 |
| T/Travis Peak | 7,470 | -7,062 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,230 | 8,238 | Perforated |
| 8,265 | 8,274 | Perforated |
| 8,676 | 8,690 | Perforated |
| 8,782 | 8,784 | Perforated |
| 8,792 | 8,796 | Perforated |
| 8,812 | 8,816 | Perforated |
| 8,896 | 9,037 | Perforated |
| 9,274 | 9,293 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 905 | 12.25 | 375 S |
| 5.5 | 9,506 | 7.875 | 900 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 4, 2000 | Sep 25, 2000 | Yes |
| 00 | Apr 20, 1999 | Apr 2, 1999 | — |
| 00 | Jan 7, 1997 | Dec 5, 1996 | — |
| 00 | Feb 2, 1994 | Oct 27, 1993 | Yes |
| 00 | Jan 3, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-293-31008 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-293-31008 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000094815 | H-1 Injection | Not activated | 5,000 | 3,000 | 6,450–6,900 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29331008, documented in the API reference.