WELL · 42-293-31132 · DISTRICT 5
Yarbrough Trust #2
Limestone County · Oletha (Travis Peak) field · Vertical
Yarbrough Trust #2 (API 42-293-31132) is a well in Limestone County operated by Marathon Oil Company, completed March 16, 1996.
The RRC has issued 2 drilling permits between 1995 and 2001, permitted to 8,500 ft.
Completion filings report 6 formation tops, including Austin Chalk, T. Paluxy, T.Paluxy, Base Massive Anhy..
No lease production has been reported under this well’s leases.
Operator of record
Houston, TX · P-5 Y, filed Apr 4, 2026 · 3,707 permits on file · (800) 332-9449
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Marathon Oil Company |
| Production reports | Marathon Oil Companythrough Sep 2001 |
| Latest permit | Marathon Oil CompanyMar 13, 2001 |
- 8,500
- total depth, ft
- 2
- permits on file
- Mar 13, 2001
- last permit issued
- Mar 16, 1996
- completed
- 0
- cumulative oil, bbl
- 263K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1996 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 16, 1996
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Yarbrough Trust G-5-181324 | Oletha (Rodessa) | Lodestone Operating, Inc. | 1 | 0 | 5.79K | Dec 2000 – Jul 2026 |
| Yarbrough Trust G-5-158225 | Oletha (Travis Peak) | Marathon Oil Company | 1 | 0 | 257K | Mar 1996 – Apr 2002 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sklar & Phillips Oil Co.Apr 1996 → Dec 1999
- 2Marathon Oil CompanyJan 2000 → Sep 2001
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 505899-99 | Recompletion | Marathon Oil Company | Feb 28, 2001 | Mar 13, 2001 | Nov 13, 2000 | 8,213 |
| 442985-99 | Drill | Sklar & Phillips Oil Co. | Dec 18, 1995 | Dec 29, 1995 | Feb 7, 1996 | 8,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-5-158225 | — | — | — | — |
| — | — G-5-181324 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 418 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin ChalkBASE AUSTIN CHALK | 3,900 | -3,482 |
| T. Paluxy | 4,630 | -4,212 |
| T.paluxy | 4,630 | -4,212 |
| Base Massive Anhy. | 6,695 | -6,277 |
| Sligo | 7,300 | -6,882 |
| Travis Peak | 7,510 | -7,092 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,758 | 6,763 | Perforated |
| 7,630 | 7,636 | Perforated |
| 7,687 | 7,693 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,248 | 11 | 330 S |
| 4.5 | 8,213 | 7.875 | 550 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 22, 2001 | Feb 26, 2001 | Yes |
| 00 | Mar 26, 2001 | — | — |
| 00 | Jun 20, 1996 | Apr 5, 1996 | Yes |
| 00 | Jun 3, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-293-31132 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-293-31132 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29331132, documented in the API reference.