WELL · 42-293-31257 · DISTRICT 5

Smith Charles #1

N

Limestone County · Box Church (Cotton Valley) field  · Vertical

Smith Charles #1 (API 42-293-31257) is a well in Limestone County operated by Sklar & Phillips Oil CO., completed October 9, 1998.

The RRC has issued 2 drilling permits (amended once) between 1998 and 1999, permitted to 9,800 ft.

Completion filings report 7 formation tops, including B. Austin Chalk, B.M.A., Sligo, Travis Peak.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit.

Operator of record

Sklar & Phillips Oil Co.

Shreveport, LA · P-5 Y, filed Jul 7, 2000 · 162 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSklar & Phillips Oil Co.
Production reportsSklar & Phillips Oil Co.through Apr 1999
Latest permitSklar & Phillips Oil Co.Jun 2, 1999
9,800
total depth, ft
3
permits on file
Jun 2, 1999
last permit issued
Oct 9, 1998
completed
0
cumulative oil, bbl
31.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1998 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 9, 1998
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Smith, Charles G-5-173207Box Church (Travis Peak)Beehive Operating, LLC100May 1999 – Jul 2026
Smith, Charles G-5-172815Box Church (Cotton Valley)Sklar & Phillips Oil Co.1031.2KJul 1998 – Aug 2000

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sklar & Phillips Oil Co.Jul 1998 → Apr 1999

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
484862-99RecompletionSklar & Phillips Oil Co.May 28, 1999Jun 2, 1999Apr 23, 19999,400
473431-98DrillSklar & Phillips Oil Co.Nov 24, 1998Feb 17, 1998—9,800
473431-99DrillSklar & Phillips Oil Co.Feb 17, 1998Feb 17, 1998Mar 14, 19989,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-172815————
—— G-5-173207————

Formation tops

As filed on W-2/G-1. Subsea from 395 ft elevation.Download CSV →

FormationMD ftSubsea
B. Austin Chalk3,298-2,903
B.M.A.5,979-5,584
Sligo6,548-6,153
Travis Peak6,710-6,315
Travis Peak8,200-7,805
C.V. "B"8,633-8,238
Cotton Valley9,000-8,605
Smackover10,800-10,405

Perforations

Perforated and open-hole intervals.

FromToType
5,5626,138Perforated
6,9256,929Perforated
7,0387,045Perforated
7,1207,124Perforated
7,1567,162Perforated
7,2227,238Perforated
7,3607,366Perforated
7,3947,402Perforated
7,5807,586Perforated
7,9267,942Perforated
8,0228,032Perforated
8,0618,069Perforated
8,6767,692Perforated
8,7828,853Perforated
8,8038,932Perforated
8,8128,991Perforated
8,8418,846Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62595712.25343 S
5.59,4007.8754,800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 12, 2000May 22, 2000—
00Jul 8, 1999Jun 11, 1999—
00Jun 24, 1999——
00May 20, 1999Feb 8, 1999Yes
00May 14, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
915K
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000089568W-14 DisposalActive2,0001,2004,540–6,220

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29331257, documented in the API reference.