WELL · 42-293-31296 · DISTRICT 5
Lyons Gas Unit No. 1 #4
Limestone County · Farrar SE (Pettit) field · Vertical
Lyons Gas Unit NO. 1 #4 (API 42-293-31296) is a plugged well in Limestone County, plugged February 12, 2011, last operated by Xto Energy Inc..
The RRC has issued 2 drilling permits between 1999 and 2007, permitted to 8,900 ft.
Completion filings report 6 formation tops, including BMA, Massive Anhydrite (marker), Rodessa, James Lime.
Operator of record
Spring, TX · P-5 Y, filed Feb 4, 2026 · 16,156 permits on file · (832) 625-1100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XTO Energy Inc. |
| Production reports | XTO Energy Inc.through Aug 2010 |
| Latest permit | XTO Energy Inc.Mar 9, 2007 |
- 8,900
- total depth, ft
- 2
- permits on file
- Mar 9, 2007
- last permit issued
- Feb 24, 2007
- completed
- 0
- cumulative oil, bbl
- 110K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 1999 THROUGH Feb 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 24, 2007
- Shut in
- —
- Plugged
- Feb 12, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Lyons Gas Unit NO 1 G-5-173820 | Farrar (Travis Peak) | XTO Energy Inc. | 1 | 0 | 110K | Jun 1999 – Feb 2011 |
| Lyons Gas Unit No. 1 G-5-230115 | Farrar, SE (Pettit) | XTO Energy Inc. | 1 | 0 | 0 | Feb 2007 – Feb 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Herd Producing Company, Inc.Jun 1999 → Dec 2000
- 2Cross Timbers Operating CompanyJan 2001 → May 2001
- 3XTO Energy Inc.Jun 2001 → Aug 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 632274-99 | Recompletion | XTO Energy Inc. | Jan 22, 2007 | Mar 9, 2007 | Jan 16, 2007 | 8,900 |
| 484134-99 | Drill | Herd Producing Company, Inc. | Apr 27, 1999 | Apr 27, 1999 | May 2, 1999 | 8,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-5-173820 | — | — | — | — |
| — | — G-5-230115 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 377 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BMA | 7,460 | -7,083 |
| Massive Anhydrite (marker)MASSIVE ANHYDRITE | 7,460 | -7,083 |
| Rodessa | 7,568 | -7,191 |
| James Lime | 8,030 | -7,653 |
| Pettit | 8,190 | -7,813 |
| Travis Peak | 8,515 | -8,138 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,255 | 8,458 | Perforated |
| 8,652 | 8,657 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,050 | 11 | 295 S |
| 4.5 | 8,904 | 7.875 | 600 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 24, 2007 | Aug 21, 2007 | — |
| 00 | Oct 17, 2007 | — | — |
| 00 | Aug 20, 1999 | Jul 14, 1999 | Yes |
| 00 | Aug 13, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-293-31296 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-293-31296 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29331296, documented in the API reference.