WELL · 42-293-31341 · DISTRICT 5

White #12

N

Limestone County · Box Church (Travis Peak) field  · Vertical

White #12 (API 42-293-31341) is a well in Limestone County operated by SM Energy Company, completed November 16, 2003.

The RRC has issued 2 drilling permits (amended once) between 2000 and 2014, permitted to 8,350 ft.

Completion filings report 6 formation tops, including Austin Chalk, Base Mass Anhydrite, BMA, Rodessa.

No lease production has been reported under this well’s leases.

Operator of record

SM Energy Company

Midland, TX · P-5 Y, filed Jul 4, 2026 · 2,485 permits on file · (432) 563-8316

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSM Energy Company
Production reportsHilltex Operating Company, LLCthrough Mar 2026
Latest permitSM Energy CompanyMar 19, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,350
total depth, ft
3
permits on file
Mar 19, 2014
last permit issued
Nov 16, 2003
completed
0
cumulative oil, bbl
870K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2000 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 16, 2003
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
White G-5-272747Box Church (Pettit)Hilltex Operating Company, LLC1047.2KApr 2014 – Jul 2026
White G-5-179493Box Church (Travis Peak)SM Energy Company10823KSep 2000 – Apr 2014

Gas, mcf lease total

Last 12 months 202 · prior 12 85(+138%)

0204060202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1St. Mary Land & Exploration Co.Sep 2000 → Jun 2010
  2. 2SM Energy CompanyJul 2010 → Feb 2015
  3. 3Aethon Energy Operating LLCJul 2015 → Jan 2018
  4. 4Downs Operating Company, LLCFeb 2018 → May 2020
  5. 5Zenith Oil & Gas, LLCJun 2020 → Feb 2023
  6. 6Beehive Operating, LLCMar 2023 → Sep 2025
  7. 7Hilltex Operating Company, LLCDec 2025 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
782037-99RecompletionSM Energy CompanyMar 12, 2014Mar 19, 2014Mar 17, 20148,350
497148-98DrillSt. Mary Land & Exploration Co.Apr 8, 2009Jul 12, 2000Jul 20, 20008,350
497148-99DrillSt. Mary Land & Exploration Co.Jul 12, 2000Jul 12, 2000Jul 20, 20008,350

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-179493————
—— G-5-272747————

Formation tops

As filed on W-2/G-1. Subsea from 431 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk3,375-2,944
Austin ChalkBASE AUSTIN CHALK3,375-2,944
Base Mass Anhydrite5,852-5,421
BMA5,852-5,421
Rodessa6,114-5,683
Pettit6,610-6,179
Travis Peak6,850-6,419

Perforations

Perforated and open-hole intervals.

FromToType
6,6056,614Perforated
6,7826,784Perforated
6,7966,798Perforated
6,8406,842Perforated
6,8466,848Perforated
7,0937,118Perforated
7,1347,150Perforated
7,2137,232Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,56212.25505 S
5.58,3507.875880 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 18, 2014May 5, 2014—
00Jan 12, 2004Dec 1, 2003—
00Dec 20, 2000Oct 16, 2000Yes
00Nov 14, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29331341, documented in the API reference.