WELL · 42-293-32045 · DISTRICT 5
Beachcomber Gas Unit No. 2 #13
Limestone County · Farrar (Travis Peak) field · Producing · Vertical
Beachcomber Gas Unit NO. 2 #13 (API 42-293-32045) is a well in Limestone County operated by Hilcorp Energy Company, completed December 21, 2025 and listed as producing on the RRC schedule.
The RRC has issued 2 drilling permits between 2007 and 2025, permitted to 14,000 ft.
Completion filings report 5 formation tops, including BMA, Pettit, Travis Peak, Cotton Valley.
No lease production has been reported under this well’s leases.
Operator of record
Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,453 permits on file · (713) 209-2411
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Hilcorp Energy Companythrough Apr 2026 |
| Latest permit | Hilcorp Energy CompanySep 8, 2025 |
- 14,000
- total depth, ft
- 2
- permits on file
- Sep 8, 2025
- last permit issued
- Dec 21, 2025
- completed
- 0
- cumulative oil, bbl
- 533K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2009 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Dec 21, 2025
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
31.422014, -96.281050
OpenStreetMap → · Google Maps →
Permit surface location from the RRC GIS record, in Limestone County.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Beachcomber Gas Unit No. 2 G-5-251001 | Farrar (Cotton Valley Lime) | Hilcorp Energy Company | 1 | 0 | 532K | Mar 2009 – Jul 2026 |
| Beachcomber Gas Unit No. 2 G-5-301436 | Farrar (Travis Peak) | Hilcorp Energy Company | 1 | 0 | 940 | Dec 2025 – Jul 2026 |
Gas, mcf lease total
Last 12 months 1,601 · prior 12 2,900(-45%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1XTO Energy Inc.Mar 2009 → Dec 2023
- 2Hilcorp Energy CompanyJan 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 910273-99 | Recompletion | Hilcorp Energy Company | Sep 5, 2025 | Sep 8, 2025 | — | 13,205 |
| 647244-99 | Drill | XTO Energy Inc. | Oct 4, 2007 | Oct 9, 2007 | Feb 1, 2009 | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-5-251001 | — | — | — | — |
| — | — G-5-301436 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 445 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BMA | 7,822 | -7,377 |
| Pettit | 8,543 | -8,098 |
| Travis Peak | 8,802 | -8,357 |
| Cotton Valley | 11,522 | -11,077 |
| CV Cons. | 11,522 | -11,077 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,047 | 11,453 | Perforated |
| 11,086 | 11,088 | Perforated |
| 11,251 | 11,253 | Perforated |
| 11,266 | 11,268 | Perforated |
| 11,276 | 11,278 | Perforated |
| 11,334 | 11,336 | Perforated |
| 11,350 | 11,352 | Perforated |
| 11,388 | 11,390 | Perforated |
| 11,403 | 11,405 | Perforated |
| 11,412 | 11,414 | Perforated |
| 11,452 | 11,453 | Perforated |
| 11,581 | 12,962 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,303 | 12.25 | 480 S |
| 5.5 | 13,205 | 8.75 | 1,430 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 26, 2026 | May 1, 2026 | — |
| 00 | Oct 22, 2009 | May 4, 2009 | Yes |
| 00 | Sep 22, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-293-32045 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-293-32045 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Nearby wells and their tops
NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM
Draw a cross-section
This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.
Carpenter Gas Unit II42-293-32252
1.6 KM · XTO Energy Inc. · Section with this well →
| BMA | 7,795 | -7,368 |
| Pettit | 8,511 | -8,084 |
| Travis Peak | 8,778 | -8,351 |
Carpenter Gas Unit II42-293-31987
2.2 KM · XTO Energy Inc. · Section with this well →
| Pettit | 8,584 | -8,183 |
| Travis Peak | 8,852 | -8,451 |
| Cotton Valley | 10,991 | -10,590 |
| CV Consolidated | 11,648 | -11,247 |
| Bossier | 12,687 | -12,286 |
| Cotton Valley | 14,062 | -13,661 |
Tumlinson-NE-Willis Alloc42-293-32412
2.5 KM · XTO Energy Inc. · Section with this well →
| Nacatoch | 2,139 | -1,697 |
| Woodbine | 4,884 | -4,442 |
| Buda | 5,219 | -4,777 |
| Glen Rose | 6,534 | -6,092 |
| Rodessa | 7,691 | -7,249 |
| Pettit | 8,369 | -7,927 |
| Travis Peak | 8,626 | -8,184 |
| Cotton Valley | 11,186 | -10,744 |
10 TOPS · FIRST 8
JH-Tumlinson-NE-Willis Allo42-293-32411
2.8 KM · XTO Energy Inc. · Section with this well →
| Nacatoch | 2,119 | -1,672 |
| Woodbine | 4,864 | -4,417 |
| Buda | 5,193 | -4,746 |
| Glen Rose | 6,508 | -6,061 |
| Rodessa | 7,707 | -7,260 |
| Pettit | 8,338 | -7,891 |
| Travis Peak | 8,624 | -8,177 |
| Cotton Valley | 11,148 | -10,701 |
10 TOPS · FIRST 8
W.O. Stone Gas Unit No. 142-293-31783
3.2 KM · XTO Energy Inc. · Section with this well →
| BMA | 7,747 | -7,329 |
| Pettit | 8,472 | -8,054 |
| Travis Peak | 8,733 | -8,315 |
| Cotton Valley | 10,693 | -10,275 |
| Bossier | 12,220 | -11,802 |
| Cotton Valley | 13,511 | -13,093 |
Standley Gas Unit No. 142-293-31604
3.8 KM · XTO Energy Inc. · Section with this well →
| BMA | 7,545 | -7,131 |
| Pettit | 8,243 | -7,829 |
| Travis Peak | 8,493 | -8,079 |
| Cotton Valley | 10,422 | -10,008 |
| Cotton Valley | 10,422 | -10,008 |
| Bossier | 11,943 | -11,529 |
| Cotton Valley | 13,108 | -12,694 |
Gail King42-289-32175
4.2 KM · XTO Energy Inc. · Section with this well →
| Nacatoch | 2,342 | -1,927 |
| Sub-Clarksville | 4,250 | -3,835 |
| Woodbine | 5,062 | -4,647 |
| Glen Rose | 6,782 | -6,367 |
| Rodessa | 7,985 | -7,570 |
| Pettit | 8,746 | -8,331 |
| Travis Peak | 9,039 | -8,624 |
| Cotton Valley | 11,826 | -11,411 |
9 TOPS · FIRST 8
Gail King42-289-31559
4.3 KM · XTO Energy Inc. · Section with this well →
| BMA | 8,063 | -7,672 |
| Pettit | 8,793 | -8,402 |
| Travis Peak | 9,000 | -8,609 |
| Cotton Valley | 11,806 | -11,415 |
| Cotton Valley | 11,915 | -11,524 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29332045, documented in the API reference.