WELL · 42-293-32215 · DISTRICT 5
Standley Gas Unit No. 1 #5H
Limestone County · Horizontal
Standley Gas Unit NO. 1 #5H (API 42-293-32215) is a permitted horizontal well in Limestone County filed by Hilcorp Energy Company; no completion report is on file yet.
The RRC has issued 2 drilling permits between 2008 and 2026, permitted to 17,000 ft.
Completion filings report 7 formation tops, including BMA, Pettit, Travis Peak, Cotton Valley.
Operator of record
Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,453 permits on file · (713) 209-2411
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Hilcorp Energy Companythrough Feb 2026 |
| Latest permit | Hilcorp Energy CompanyApr 20, 2026 |
- 17,000
- total depth, ft
- 2
- permits on file
- Apr 20, 2026
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 1.5M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2009 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Standley Gas Unit No. 1 G-5-252420 | Farrar (Cotton Valley Lime) | Hilcorp Energy Company | 1 | 0 | 1.5M | Jun 2009 – Jul 2026 |
Gas, mcf lease total
Last 12 months 4,075 · prior 12 5,630(-28%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1XTO Energy Inc.Jun 2009 → Dec 2023
- 2Hilcorp Energy CompanyJan 2024 → Feb 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 914828-99 | Recompletion | Hilcorp Energy Company | Apr 13, 2026 | Apr 20, 2026 | — | 16,100 |
| 675546-99 | Drill | XTO Energy Inc. | Nov 25, 2008 | Dec 9, 2008 | Apr 27, 2009 | 17,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-5-252420 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 417 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BMA | 7,554 | -7,137 |
| Pettit | 8,243 | -7,826 |
| Pettit | 8,246 | -7,829 |
| Travis Peak | 8,489 | -8,072 |
| Travis Peak | 8,495 | -8,078 |
| Cotton Valley | 10,983 | -10,566 |
| CV Cons. | 10,986 | -10,569 |
| Bossier | 11,937 | -11,520 |
| CVL | 13,188 | -12,771 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,601 | 8,603 | Perforated |
| 8,622 | 8,624 | Perforated |
| 8,678 | 8,680 | Perforated |
| 8,687 | 8,689 | Perforated |
| 8,771 | 8,773 | Perforated |
| 8,846 | 8,850 | Perforated |
| 8,876 | 8,878 | Perforated |
| 8,921 | 8,923 | Perforated |
| 13,750 | 15,752 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 5,160 | 12.25 | 850 S |
| 9.625 | 5,260 | 12.25 | 1,515 S |
| 5.5 | 16,100 | 8.75 | 2,205 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 31, 2026 | Jun 24, 2026 | — |
| 00 | Jan 25, 2010 | Jul 20, 2009 | Yes |
| 00 | Nov 5, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-293-32215 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-293-32215 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29332215, documented in the API reference.