WELL · 42-293-32410 · DISTRICT 5
NM 1213 #1
Limestone County · Mexia field · Injection · Vertical
NM 1213 #1 (API 42-293-32410) is a well in Limestone County operated by Southwest Operating Inc.-Tyler, completed August 12, 2019 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit, issued March 6, 2019, permitted to 3,900 ft.
It was permitted by Compadre Resources, LLC and has since transferred to Southwest Operating Inc.-Tyler on the wellbore schedule.
Completion filings report 9 formation tops, including Woodbine, Buda, Cotton Valley, Glen Rose.
Its lease has reported 12.5K barrels of oil since April 2019, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit, with 40.8K barrels injected in the 12 months reported through November 2025; TexNet located 0 M2+ earthquakes within 10 km over the last two years.
Operator of record
Southwest Operating Inc.-Tyler
Permitted by Compadre Resources, LLC; the EWA schedule now lists a different operator.
Tyler, TX · P-5 Y, filed Feb 4, 2026 · 63 permits on file · (903) 530-1563
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Southwest Operating Inc.-Tyler |
| Production reports | Southwest Operating, Inc.-Tylerthrough Apr 2026 |
| Latest permit | Compadre Resources, LLCMar 6, 2019 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,900
- total depth, ft
- 1
- permits on file
- Mar 6, 2019
- last permit issued
- Aug 12, 2019
- completed
- 12.5K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2019 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 12, 2019
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
31.682087, -96.513612
OpenStreetMap → · Google Maps →
Permit surface location from the RRC GIS record, in Limestone County.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| NM 1213 O-5-4401 | Mexia | Southwest Operating, Inc.-Tyler | 2 | 12.5K | 0 | Apr 2019 – Jul 2026 |
Oil, barrels lease total
Last 12 months 2,514 · prior 12 2,806(-10%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Compadre Resources, LLCNov 2019 → Nov 2019
- 2Southwest Operating, Inc.-TylerJan 2021 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 850526-99 | Drill | Compadre Resources, LLC | Feb 28, 2019 | Mar 6, 2019 | Apr 3, 2019 | 3,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-5-4401 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 530 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Woodbine | 2,325 | -1,795 |
| Buda | — | — |
| Cotton Valley | — | — |
| Cotton ValleyCOTTON VALLEY LIME | — | — |
| Glen Rose | — | — |
| Nacatoch | — | — |
| PettitPETTET | — | — |
| Rodessa | — | — |
| Smackover | — | — |
| Travis Peak | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,975 | 2,986 | Perforated |
| 2,975 | 3,066 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 420 | 11 | 165 S |
| 5.5 | 3,305 | 7.875 | 322 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 18, 2024 | May 24, 2022 | — |
| 00 | Apr 13, 2020 | Dec 16, 2019 | Yes |
| 00 | Nov 19, 2019 | Oct 1, 2019 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-293-32410 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-293-32410 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Nearby wells and their tops
NEAREST 2 LOCATED WELLS WITH TOPS · WITHIN 16 KM
Draw a cross-section
This well's tops beside its 2 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.
NM 121342-293-32413
0.0 KM · Southwest Operating, Inc.-Tyler · Section with this well →
| Nacatoch | 350 | |
| Woodbine | 2,325 | |
| Buda | — | |
| Cotton Valley | — | |
| Cotton Valley | — | |
| Glen Rose | — | |
| Pettit | — | |
| Rodessa | — |
10 TOPS · FIRST 8
NM 542-293-32409
1.6 KM · Compadre Resources, LLC · Section with this well →
| Woodbine | 2,327 | -1,810 |
| Cotton Valley | — | |
| Cotton Valley | — | |
| Glen Rose | — | |
| Nacatoch | — | |
| Buda | — | |
| Rodessa | — | |
| Smackover | — |
10 TOPS · FIRST 8
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 40.8K
- bbl, last 12 reported months
- 169K
- bbl, all reported
- Nov 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000124274 | H-1 Injection | Active | 2,500 | 1,487 | 2,975–3,066 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 40,830 · prior 12 41,299(-1%)
TexNet catalog via USGS
Seismicity near this well
- 0
- M2+ events within 10 km, last 2 years
- —
- largest
A proximity count, not an attribution. How to read it →
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29332410, documented in the API reference.