WELL · 42-295-30085 · DISTRICT 10

Bradford B #1

N

Lipscomb County · Bradford (Cleveland) field  · Vertical

Bradford B #1 (API 42-295-30085) is a well in Lipscomb County operated by BP America Production Company, completed March 2, 2004.

The RRC has issued one drilling permit, issued February 20, 2003, permitted to 10,100 ft.

Completion filings report 5 formation tops, including Douglas, Tonkawa, Cleveland, Morrow.

Its 3 leases have reported 1.59K barrels of oil and 1.4M mcf of gas since January 1993, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

BP America Production Company

Denver, CO · P-5 Y, filed May 4, 2026 · 1,623 permits on file · (720) 439-5104

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBP America Production Company
Production reportsLatigo Petroleum, LLCthrough Mar 2026
Latest permitBP America Production CompanyFeb 20, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,100
total depth, ft
1
permits on file
Feb 20, 2003
last permit issued
Mar 2, 2004
completed
1.59K
cumulative oil, bbl
1.4M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 2, 2004
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bradford -B- G-14-53931Bradford (Morrow)Latigo Petroleum, LLC10449KJan 1993 – Jul 2026
Bradford "B" G-14-213102Lipscomb (Cleveland)Latigo Petroleum, LLC10873KMar 2005 – Jul 2026
Bradford "B" O-14-7266Bradford (Cleveland)BP America Production Company21.59K78.3KMar 1998 – Jul 2006

Gas, mcf lease total

Last 12 months 22,558 · prior 12 25,544(-12%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Maxus Exploration CompanyJan 1993 → Jan 1995
  2. 2Midgard Energy CompanyFeb 1995 → Sep 1997
  3. 3Crescendo Resources, L.P.Oct 1997 → Mar 2000
  4. 4Amoco Production CompanyApr 2000 → Dec 2001
  5. 5BP America Production CompanyJan 2002 → Feb 2020
  6. 6Latigo Petroleum, LLCMar 2020 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
528341-99RecompletionBP America Production CompanyFeb 11, 2003Feb 20, 2003Mar 24, 200310,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-53931————
—— G-14-213102————
—— O-14-7266————

Formation tops

As filed on W-2/G-1. Subsea from 2,491 ft elevation.Download CSV →

FormationMD ftSubsea
DouglasDOUGLAS SAND5,893-3,402
Tonkawa6,538-4,047
Cleveland7,570-5,079
MorrowMORROW SHALE9,016-6,525
MorrowLOWER MORROW PAY9,610-7,119
Mississippian9,943-7,452

Perforations

Perforated and open-hole intervals.

FromToType
7,5707,610Perforated
9,6189,794Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62585012.25450 S
8.625850—450 S
4.510,1007.875250 S
4.510,100—250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 13, 2006Feb 8, 2006—
00Mar 27, 2006Jun 17, 2005—
00Jan 9, 2006——
00Jun 30, 2004Apr 26, 2004Yes
00May 25, 2004——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29530085, documented in the API reference.