WELL · 42-295-30906 · DISTRICT 10

Schultz -D- #1 872P

Plugged

Lipscomb County · Mammoth Creek North (Cleveland) field  · Vertical

Schultz -D- #1 872P (API 42-295-30906) is a plugged well in Lipscomb County, plugged November 16, 2021, last operated by Strat Land Exploration Company.

The RRC has issued one drilling permit, issued November 6, 1980, permitted to 10,120 ft.

It was permitted by Geodyne Resources Inc. and has since transferred to Strat Land Exploration Company on the wellbore schedule.

Completion filings report 6 formation tops, including Douglas, Tonkawa, Cleveland, 13 Finger Lime.

Operator of record

Strat Land Exploration Company

Permitted by Geodyne Resources Inc.; the EWA schedule now lists a different operator.

Tulsa, OK · P-5 Y, filed Nov 4, 2022 · 607 permits on file · (806) 435-7292

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStrat Land Exploration Company
Production reportsStrat Land Exploration Companythrough Mar 1994
Latest permitGeodyne Resources Inc.Nov 6, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,120
total depth, ft
1
permits on file
Nov 6, 1980
last permit issued
Apr 1, 1981
completed
0
cumulative oil, bbl
8.7K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2021

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 1, 1981
Shut in
—
Plugged
Nov 16, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Schultz -D- G-14-94650Mammoth Creek, North (Cleveland)Strat Land Exploration Company108.7KJan 1993 – Nov 2021

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Strat Land Exploration CompanyJan 1993 → Mar 1994

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
98104-99DrillGeodyne Resources Inc.Nov 6, 1980Nov 6, 1980Nov 24, 198010,120

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-94650————

Formation tops

As filed on W-2/G-1. Subsea from 2,528 ft elevation.Download CSV →

FormationMD ftSubsea
DouglasDOUGLAS SAND6,220-3,692
TonkawaTONKAWA SAND6,646-4,118
ClevelandCLEVELAND SAND7,656-5,128
13 Finger Lime8,852-6,324
MorrowUPPER MORROW SAND9,212-6,684
MississippianMISSISSIPPI CHESTER10,028-7,500

Perforations

Perforated and open-hole intervals.

FromToType
3,6003,650Perforated
3,7703,804Perforated
3,8463,857Perforated
7,7047,720Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,29912.251,650 S
2.3757,666——
4.510,1107.875350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 23, 1995Mar 24, 1995—
00Jan 12, 1984Apr 23, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
418K
bbl, all reported
Mar 2022
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000083025W-14 DisposalPlugged Nov 29, 20212002003,600–3,857

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120212022

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29530906, documented in the API reference.