WELL · 42-295-30947 · DISTRICT 10

Peil Christ #2

Y

Lipscomb County · Lipscomb (Cleveland) field · Producing  · Horizontal

Peil Christ #2 (API 42-295-30947) is a horizontal well in Lipscomb County operated by Latigo Petroleum LLC, completed February 28, 2008 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1981 and 2007, permitted to 9,850 ft.

It was permitted by BP America Production Company and has since transferred to Latigo Petroleum LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Brown Dolomite, Douglas, Tonkawa, Cleveland.

No lease production has been reported under this well’s leases.

Operator of record

Latigo Petroleum LLC

Permitted by BP America Production Company; the EWA schedule now lists a different operator.

Pampa, TX · P-5 Y, filed May 4, 2026 · 76 permits on file · (432) 550-2320

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLatigo Petroleum LLC
Production reportsLatigo Petroleum, LLCthrough Mar 2026
Latest permitBP America Production CompanyAug 3, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,850
total depth, ft
2
permits on file
Aug 3, 2007
last permit issued
Feb 28, 2008
completed
0
cumulative oil, bbl
1.55M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 28, 2008
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Peil, Christ G-14-96138Mammoth Creek, North (Cleveland)Latigo Petroleum, LLC101.55MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 26,276 · prior 12 30,437(-14%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Maxus Exploration CompanyJan 1993 → Jan 1995
  2. 2Midgard Energy CompanyFeb 1995 → Sep 1997
  3. 3Crescendo Resources, L.P.Oct 1997 → Mar 2000
  4. 4Amoco Production CompanyApr 2000 → Dec 2001
  5. 5BP America Production CompanyJan 2002 → Feb 2020
  6. 6Latigo Petroleum, LLCMar 2020 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
643040-99RecompletionBP America Production CompanyJul 23, 2007Aug 3, 2007Dec 27, 20079,850
107161-99DrillDiamond Chemicals CompanyJan 30, 1981Jan 30, 1981Jul 13, 19817,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-96138————

Formation tops

As filed on W-2/G-1. Subsea from 2,675 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite3,392-717
Douglas6,037-3,362
Tonkawa6,534-3,859
Cleveland7,477-4,802

Perforations

Perforated and open-hole intervals.

FromToType
7,5187,552Perforated
8,3909,105Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,39212.25930 S
8.6251,39512.25950 S
2.3757,513——
5.57,7147.875200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 14, 2008Mar 27, 2008Yes
00Jan 12, 1984Nov 2, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29530947, documented in the API reference.