WELL · 42-295-31561 · DISTRICT 10
Cleveland #2
Lipscomb County · Higgins West (Tonkawa) field · Vertical
Cleveland #2 (API 42-295-31561) is a plugged well in Lipscomb County, plugged December 6, 1993, last operated by Wolf Creek Exploration Company.
The RRC has issued 2 drilling permits between 1985 and 1991, permitted to 11,500 ft.
Completion filings report 5 formation tops, including Douglas, Tonkawa, Clevelandsand, Atoka.
Its 2 leases have reported 232 barrels of oil and 432 mcf of gas since January 1993, last reporting in January 1994.
Operator of record
Wolf Creek Exploration Company
Amarillo, TX · P-5 Y, filed Nov 8, 2002 · 14 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Wolf Creek Exploration Company |
| Production reports | Wolf Creek Exploration Companythrough Aug 1993 |
| Latest permit | Wolf Creek Exploration CompanyJan 7, 1991 |
- 11,500
- total depth, ft
- 2
- permits on file
- Jan 7, 1991
- last permit issued
- Feb 21, 1991
- completed
- 232
- cumulative oil, bbl
- 432
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 1994
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 21, 1991
- Shut in
- —
- Plugged
- Dec 6, 1993
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cleveland O-14-6773 | Higgins, West (Tonkawa) | Wolf Creek Exploration Company | 1 | 232 | 432 | Jan 1993 – Jan 1994 |
| — G-14-115308 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Wolf Creek Exploration CompanyJan 1993 → Aug 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 382918-99 | Recompletion | Wolf Creek Exploration Company | Dec 31, 1990 | Jan 7, 1991 | Dec 3, 1990 | 10,918 |
| 253877-99 | Drill | Philcon Development Co. | Feb 19, 1985 | Feb 20, 1985 | Oct 13, 1984 | 11,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-115308 | — | — | — | — |
| — | — O-14-6773 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,732 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,515 | 7,520 | Perforated |
| 7,530 | 7,535 | Perforated |
| 7,580 | 7,585 | Perforated |
| 10,308 | 10,316 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 3,194 | 11 | 1,590 S |
| 8.625 | 3,215 | 11.25 | 400 S |
| 3.5 | 10,196 | 7.875 | 1,190 S |
| 3.5 | 10,890 | 7.875 | 372 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 7, 1991 | Feb 26, 1991 | Yes |
| 00 | Mar 4, 1991 | — | — |
| 00 | May 2, 1985 | Feb 15, 1985 | — |
| 00 | Mar 29, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-295-31561 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-295-31561 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29531561, documented in the API reference.